12
Installation instructions
Mechanical section
1.
The inventory audit allows any missing system compo-
nents required for commissioning to be determined
early. If significant deficiencies on CERTO are detect-
ed prior to commissioning (e.g. transport damage),
the commissioning should be ceased pending further
action or repair. Regardless of circumstances, con-
sult with Klingenburg GmbH on how best to proceed.
2.
Checking of the piping between the pump station
and humidifier. Here, care should be taken to ensure
stress-free laying (no twists, kinks and air pockets). In
addition, the high-pressure hose should be installed
in a way that eliminates friction. (Risk of fraying dur-
ing pump operation). The connection fittings on the
humidifier or the pump station should be checked.
The check should be performed using two wrenches
for counterholding. The internal screw connections of
the pump station are factory-tightened and sealed.
Any subsequent adjustment will inevitably result in
leakages.
3.
General visual inspection of the hose connections
within the pump station.
4.
Checking the oil level of the pump via the dipstick at
the bleeder screw or via the sight glass. Where appli-
cable, the gear oil ISO VG 220 GL4 (e.g. Aral Degol
BG220) should be refilled.
5.
Checking the proper connection of the water drain:
The drip molding via siphon has to be designed as a
free drain und must not be connected to the waste-
water network. The water trap in the siphon should be
filled before switching on the fans, otherwise the wa-
ter may stop flowing due to a vacuum in the device,
which can cause damage.