SONNENWIESE
PAGE 20
5000511/11.19
Specifications only for technicians and Klafs
professionals - Installing the equipment
9.1.
Installation and ceiling requirements - Housing
assembly
Fitting to the ceiling
As standard, the device is delivered with the cover plate (
10/1
)
mounted on top. For a ceiling installation, the air-outlet cover
plate (
10/1
) is mounted on top, pointing downwards.
1.
Remove the air-outlet cover plate (
10/1
) and screw the plate
back into the bottom bore holes (
10/2
).
11
Timber-beam ceiling
Concrete ceiling
70 mm
Æ
12 mm
60 mm
Æ
12 mm
8
7
10
3
1
7
2
3
9
6
10
2
1
Caution!
The device must always be kept horizontal. Do not tilt it.
Switch off all fuses.
Mounting the eye bolts - Suspended ceiling
1.
Take the mounting template and saw an opening
(1725 mm x 415 mm) into the suspended ceiling where you
intend to install the device.
2.
Drill four 12-mm-diameter holes into the
load-bearing concrete
ceiling
spaced in relation to the cut-out opening as indicated
by the four round markings on mounting template. The
minimum hole depth must be 60 mm.
Concrete ceiling
1.
Drill four 12-mm-diameter holes into the concrete ceiling at
the required assembly location according to the four round
markings drawn on the mounting template. The minimum hole
depth must be 60 mm. The cut-out (1725 mm x 415 mm) on
the mounting template is the size of the housing.
2.
Place the four SLM 8 N (
11/1
) dowels supplied into the
holes.
3.
Screw in the four eye bolts (
11/2
) using a washer and a M8
nut for each, in accordance with Fig. 10 and tighten the eye
bolt against the nut (
11/3
).
Caution!
It is absolutely essential that the eye bolts (
11/2
) are
tightened against the nut (
11/3
).
Continued on the next page
Содержание 7824
Страница 1: ...Operating Instructions SONNENWIESE...
Страница 29: ...SONNENWIESE PAGE 29 5000511 11 19...
Страница 30: ...SONNENWIESE PAGE 30 5000511 11 19...