www.kiturami.co.kr
Operation & Installation
– Method of boiler operating
kituami
Page 18
1. Connect the power plug of the boiler.
2. Turn "ON" the earth leakage breaker switch at the left of the control.(Fig. 1.)
3. The main switch located on the side of the HOT-4000P should be switched on.(Fig.2)
4. Check if power is supplied to the auxiliary control and the room control.
5. Fill the hopper with fuel (60Kg or more) and the Container with water about 5L.(Fig. 1)
6. After turning "OFF" the HOT-4000P Power , push for 5 sec. the fuel supply button.
Then, the fuel supply device operates manually to supply fuel approximately during
3 min. (Fig. 3.)
7. If fuel is supplied to the burner, push power button.
8. After turning "ON" the HOT-4000P power button. set the setting temperature of the
room controller higher than current temperature.
9. Check if the boiler operates normally and the circulation pump becomes ON/OFF
repeatedly.
10. If not operated normally, check contents of " Error code & troubleshooting" and
take actions. Then, request A/S center for follow-up measures.
Main switch
Fuel supply
Earth leackage breaker
Container for water(about 5L) .
The fuel supply button