www.kiturami.co.kr
Operation & Installation – Preparing the base
kituami
Page 9
Careful planning at an early stage will greatly help the installation process and make
sure that all the required clearances are adhered to for servicing and that any
potential issues with the routing of the flue can be resolved.
The KRP-20PA,50PA pellet boiler should be positioned on a non-combustible base.
Refer to service and access clearances around the appliance on page 6.