Pre-Installation Considerations
kituami
Page 3
we recommends using certified fuel in its appliances to ENplus-A1
The use of fuel of inferior quality or not conforming to the specification
given above compromises the running of your appliance and can therefore
lead to the termination of the guarantee and of the manufacturer's
responsibility for the product. Domestic pellet appliances run exclusively on
pellets with a diameter of 6mm
CONSIDERATIONS FOR INSTALLATION
IMPORTANT!
Installation and assembly of the appliance must be carried out by qualified personnel.
The appliance must be installed in a suitable position to allow the normal operations
of opening and ordinary maintenance.
The site must be:
• capable of providing the environmental conditions for operation
• equipped with power supply 230V 50 Hz (EN73-23)
• capable of taking an adequate system for smoke discharge
• provided with external ventilation (if located indoors)
• provided with an earth connection complying with CEI 64-8
The appliance must be connected to a flue pipe or an internal or external vertical duct
conforming to current standards UNI7129 - 7131 9615.
The boiler must be positioned in such a way that the power isolation fuse
is accessible.
The boiler must be connected to a flue pipe or a vertical duct which can
discharge the fumes at the highest point of the building.
The fumes are however derived from the combustion of wood products,
and if they come into contact with or close to walls, they can cause smoke
staining.
Also take care because the fumes are very hot and almost invisible, and
can cause burns on contact.