78
Figure 6-38
Figure 6-39
20)
Make certain the wire rope is tight against the Terminal Wedge in the Terminal.
21)
Attach the Wire Rope Clamp approximately 4 times the Wire Rope diameter from the Terminal as
shown in
Figure 6-40
and fully tighten the nuts to a torque value of approximately 80 lbf-inch (9 N*m).
Do NOT clamp the free end of the rope to the load bearing rope fall (the rope between the Terminal
and the Bottom Hook Block) see
Figure 6-41
.
Figure 6-40
Figure 6-41
22)
Insert the Terminal into the Rope Anchorage Assembly. Attach the Rope Anchorage Assembly into the
Hangar using the Rope Anchorage Shaft as shown in
Figure 6-42
. Firmly reattach the Snap Ring to
the Rope Anchorage Shaft as shown in
Figure 6-43
.
Содержание Harrington RY Series
Страница 15: ...15 2 3 Part Names Figure 2 1 RY Part Names...
Страница 42: ...42 Figure 3 20 Hoist Upper and Lower Limit Switch ULLS...
Страница 57: ...57 Table 5 8 Various shapes that require the wire rope to be replaced...
Страница 67: ...67 Table 6 9 Motor Brake Gap Capacity Code Brake Gap G inch mm RY030 RY050 0 032 0 8...
Страница 104: ...104 9 3 Trolley Frame Parts Figure 9 3 Trolley Frame Parts...
Страница 112: ...112 9 10 Hoist Motor Parts Figure 9 10 Hoist Motor Parts...
Страница 114: ...114 9 11 Trolley Motor Parts Figure 9 11 Trolley Motor Parts...
Страница 116: ...116 9 12 Control Panel Box Parts Figure 9 12 Control Panel Box Parts...
Страница 119: ...119 This Page Intentionally Left Blank...