VL60EGS Side Grill Installation ZCVRB47
Option
Contents of Kit:
[Qty 2] Side Grill assemblies (ready to paint).
Ceiling
Enclosure
Top
2” MAX from
Enclosure
Top
Grills must be used on
Left and Right Side
of
Chase
Pressure Fit into
Framed Opening
15-1/4” x 6-5/8” Tall opening required.
Pressure Fit into 15-1/4” Opening
Fits into 6-5/8” Opening
⚠
Grill Openings Must be
within 2” of Enclosure Top.
Pressure Point
Vertical Studs are required for Pressure Fit
2” MAX
18-1/4”
52”
70” MIN
57”
50”
⚠
Grill openings must be within 2” of enclosure top.
This is to prevent excess heat from becoming trapped
in the top of the chase.
See installation section of manual.
- Suggested Framing for VL60EGS Side Grills -
Ventilation Plates must be removed
26
Содержание ZCVRB47
Страница 47: ...Gas Conversion for Modulator PART C 47...
Страница 60: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 60...
Страница 61: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 61...
Страница 68: ...Proflame 2 Remote Control 68...
Страница 70: ...70...