VL60EGS Side Grill Installation ZCVRB60
Option
Contents of Kit:
[Qty 2] Side Grill assemblies (ready to paint).
Ceiling
Enclosure
Top
3/4” MAX from
Enclosure Top
Grills must be used on
Left and Right Side
of
Chase
Pressure Fit into
Framed Opening
15-1/4” x 6-5/8” Tall opening required.
Pressure Fit into 15-1/4” Opening
Fits into 6-5/8” Opening
⚠
Grill Openings Must be
within 3/4” of Enclosure Top.
Pressure Point
Vertical Studs are required for Pressure Fit
3/4” MAX
18-1/4”
70” MIN
57”
50”
⚠
Grill openings must be within 3/4” of enclosure
top. This is to prevent excess heat from becoming
trapped in the top of the chase.
See installation section of manual.
Ventilation Plates must be removed
67”
19-1/4”
67”
74”
19-1/4”
56”
76”
26
Содержание marquis MQZCVRB60LPE2
Страница 47: ...Gas Conversion for Modulator PART C 47...
Страница 61: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 61...
Страница 69: ...Proflame 2 Remote Control 69...
Страница 71: ...71...