![Kinemetrics EpiSensor FBA ES-T Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/kinemetrics/episensor-fba-es-t/episensor-fba-es-t_user-manual_1968295019.webp)
D
OCUMENT
301900,
R
EVISION
D
E
PI
S
ENSOR
U
SER
G
UIDE
3
2.
Installation Basics
Requirements for Installation
Listed below are the tools, supplies and equipment required to install the
EpiSensor in a typical configuration (remotely from a Kinemetrics recorder,
and attached to that recorder via cable). However, certain installations may
require additional tools, supplies or equipment, depending on specific sites
and needs.
If you need to assemble the cable for the EpiSensor you will need additional
tools and supplies. Refer to Chapter 6 for information on cable assembly.
These instructions assume that all civil engineering works (concrete pad,
conduit, etc.) have been finished and that the EpiSensor has been correctly
configured for your installation at our facility. If you need to change the
full-scale range output level or select the low-noise option, refer to Chapter
3 before proceeding.
Required Tools
!
Screwdrivers (1/8" flat blade, 1/4" flat blade)
!
5/64" or 2mm hex ball driver (for zero adjustment)
!
Long-nose pliers
!
AC-powered masonry percussion drill with 1/4" bit for drilling the
anchor stud hole or fully charged battery-powered drill
!
7/16" open end wrench for 1/4-20 bolt
!
Hammer
!
Safety glasses
!
1/8" hex driver for leveling feet