
2-10 Installation and Preparation
PLZ-U
8.
Turn off the POWER switch to
fi
nish the operation check procedure.
• To prevent malfunction, allow at least 5 s between power cycles.
If the PLZ-U does not operate as described in the procedure
If the condition does not change even after taking the countermeasure indicated
below, contact your Kikusui agent.
■
Nothing is displayed.
Turn off the POWER switch and check the power cord connection.
■
The load unit freezes while displaying the model and version.
Turn off the POWER switch and check that the load unit is installed
correctly.
■
An alarm occurs.
See section 4.4, “Protection Functions and Alarms”
CAUTION
Содержание PLZ-30F
Страница 32: ...2 18 Installation and Preparation PLZ U ...
Страница 58: ...4 14 Basic Operation PLZ U ...
Страница 144: ...6 52 Remote Control PLZ U ...
Страница 145: ...PLZ U Maintenance 7 1 Chapter 7 Maintenance This chapter explains the PLZ U maintenance 7 7 ...
Страница 186: ...A 26 Appendix PLZ U ...
Страница 190: ...I 4 Index PLZ U ...
Страница 191: ......