
2-6 Installation and Preparation
PLZ-U
2.4
Installing Load Units
Install the load units into the empty slots of the frame. Channel numbers are auto-
matically assigned to the load units. The left most load units is CH1.
• Turn off the POWER switch. Installing a load unit while the power is turned
on can cause electric shock or damage to the PLZ-U.
■
Installation procedure
1.
Remove the blank panels (front and rear panels) from the slot where
the load unit is to be installed.
Fig. 2-3
Removing the blank panels
WARNING
Blank panel (rear panel)
Pinch the center section of the blank panel.
Pull it off towards you.
1
2
1
2
Insert a flat-blade screwdriver or something similar into
the rectangular hole on the top of the cover.
Blank panel (front panel)
1
2
Pull the blank panel off towards you.
1
2
Содержание PLZ-30F
Страница 32: ...2 18 Installation and Preparation PLZ U ...
Страница 58: ...4 14 Basic Operation PLZ U ...
Страница 144: ...6 52 Remote Control PLZ U ...
Страница 145: ...PLZ U Maintenance 7 1 Chapter 7 Maintenance This chapter explains the PLZ U maintenance 7 7 ...
Страница 186: ...A 26 Appendix PLZ U ...
Страница 190: ...I 4 Index PLZ U ...
Страница 191: ......