H:
Taking note of hole orientation, place 1 (074) Upright Center against the end of (073) Center Tie, making sure
that its flush with the edge of (071) Panel Assembly. The bottom of the board should be on the inside of (021)
Lower Front Back. Attach the upper section of (074) Upright Center to the assembly using 6 (S20) #8 x 1 -3/8”
Wood Screws. (fig. 7.10)
I:
Place 1 (075) Upright Block so that it sits flush between (021) Lower Front Back and (074) Upright Center.
From the outside install 1 (H2) 1/4 x 2” Hex Bolt (with lock washer, flat washer and t-nut) and from the inside
install 2 (S20) #8 x 1 -3/8” Wood Screws. (fig. 7.10 and fig. 7.11)
J:
Repeat Steps H and I to install (074) Upright Center on the Back Wall.
Repeat Steps H and I to install (074)
Upright Center on the Back Wall.
28
Step 7: Playhouse Assembly
Part 6
Fig. 7.10
Fig. 7.11
S20
S20
2 x 1/4 x 2” Hex Bolts
(with flat washer, lock washer and t-nut)
H2
H2
071
Flush
074
073
024
H2
1/4” Flat
Washer
1/4” Lock
Washer
Inside View
1/4” T-Nut
S20
S20
16 x
#8 x 1-3/8” Wood Screw
S20
021
Flush
021
075
074
075
Hardware
2 x
Upright Center 5/8 x 3 x 61”
2 x
Upright Block 5/8 x 3 x 4-1/2”
Wood Parts
074
075