A:
With a helper lift (071) Panel Assembly up onto the righthand side of the playhouse floor and place it upright
with the open end at the front. (fig. 7.1)
B:
On the inside of (023) Upright Long, place 1 (072) Side Barrier Top so that it’s tight to (043) SL Barrier and all boards
are flush at the top. The other end should be tight to the (071) Panel Assembly (fig. 7.1). Attach (072) Side Barrier to
(023) Upright from the outside using 1 (H3) 1/4 x 2 -1/2” Hex Bolt (with lock washer, flat washer and t-nut) and to (043)
SL Barrier Top with 1 (S3) #8 x 2 – ½” Wood Screw (fig. 7.1 and fig. 7.2). Check that (072) Side Barrier is level then
attach other end to (071) Panel Assembly from the inside using 2 (S3) #8 x 2 – 1/2” Wood Screws. (fig. 7.1, fig. 7.3 and
fig. 7.4)
C:
Repeat Step B to install a second (072) Barrier Top on the Back Wall. (fig. 7.1, fig. 7.2, fig. 7.3 and fig. 7.4)
23
Fig. 7.1
Flush
Make sure the 072 side
barrier top is level
072
071
Step 7: Playhouse Assembly
Part 1
071
072
Fig. 7.4
S3
071
072
Fig. 7.3
S3
Flush
043
023
072
Fig. 7.2
S3
H3
1/4” Lock
Washer
1/4” T-Nut
x 2
1/4” Flat
Washer
2 x 1/4 x 2-1/2” Hex Bolts
(with flat washer, lock washer and t-nut)
6 x
#8 x 2-1/2” Wood Screw
H3
S3
Hardware
1 x
Panel Assembly 8 x 22 x 43”
2 x
Side Barrier Top 1-1/4 x 3 x 32-7/8”
Wood Parts
071
072
Flush
Flush
Flush
023
023
043