14 Installation Note N5247-90116
Description of the Upgrade
Installation Procedure for the Upgrade
-
Overview of the Installation Procedure
“Step 1. Obtain a Keyword and Verify the Information.”
“Step 2. Remove the Outer Cover.”
“Step 3. Remove the Inner Cover.”
“Step 4. Remove the Front Panel Assembly.”
“Step 5. Remove Some of the Existing Test Set Cables.”
“Step 6. Assemble the A23 Test Set Motherboard.”
“Step 7. Install the A59 Noise Downconverter (Receiver) to the Chassis.”
“Step 8. Install the A57 Noise Switch (Port 2) to Bracket and Attach Cables to
A59 Noise Downconverter (Receiver) Assembly.”
“Step 9. Install Semirigid Cables to the Noise Assembly.”
“Step 10. Install Switch Bracket and Switch.”
“Step 11. Install the A56 Switch to Bracket and Bracket to the Chassis.”
“Step 12. Install the A64 Tuner to Chassis and Attach Cable to the Tuner.”
“Step 13. Install the A9 Noise Receiver Board.”
“Step 14. Install the New Test Set Cables.”
“Step 15. Replace the lower front panel overlay.”
“Step 16. Reinstall the Front Panel Assembly.”
“Step 17. Install the New Lower Front Panel Overlay.”
“Step 18. Position the Cables and Wires to Prevent Pinching.”
“Step 19. Reinstall the Inner Cover.”
“Step 20. Reinstall the Outer Cover.”
“Step 21. Remove Option 028 License.”
“Step 22. Enable Option 029.”
“Step 23. Verify the PNA Analyzer Program is Running with the Correct
Options.”
“Step 24. Perform Post-Upgrade Adjustments and Calibration.”
“Step 25. Prepare the PNA for the User.”
Содержание N5247-60116
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 44: ...44 Installation Note N5247 90116 Description of the Upgrade Installation Procedure for the Upgrade ...
Страница 45: ...Installation Note Xxxxx xxxxx 3 ...