32
Keysight M9514A Site Preparation and Installation Guide
Rack Mount the Chassis
Procedure
6
Attach the support rails to the rack’s inside vertical columns. Use four clip-on
sheet metal nuts (also called channel nuts) and the four 10-32 x 0.5 support
rail-to-rack pan head screws as shown in Figure 6.
7
Refer to Figure 7 as a template for placing the clip-on sheet metal nuts. Mark
the position the flange mounting holes on the rack’s vertical columns where
the chassis is to be mounted. Slide clip-on sheet metal nuts over the rack
holes to be used by the rack mount flanges.
Figure 6
Attach the Support Rails to the Rack
10-32 x .5
Pan Head screws
Clip
‐
on
sheet
metal
nuts
2
required
for
each
rail
On Agilent racks, bottom
of rail aligns with arrow
marking EIA units.
For detailed chassis dimensions, refer to Appendix A in the M9514A
Service Guide.
Содержание M9514A
Страница 1: ...Keysight AXIe 14 Slot Chassis M9514A SitePreparationand Installation Guide...
Страница 2: ......
Страница 6: ...vi...
Страница 14: ...16 Keysight M9514A Site Preparation and Installation Guide Introduction Plan the Chassis Installation...
Страница 37: ...Keysight M9514A Site Preparation and Installation Guide 39 Service and Support Additional Information...
Страница 40: ...42 Keysight M9514A AXIe 14 Slot Chassis Safety Related Specifications...
Страница 44: ...46 Keysight M9514A Site Preparation and Installation Guide Power Cords...