38 Keysight N5280A User’s and Service Guide
N5280A
Operational Check
-
Operational Check Procedure (Option 002)
The N5280A operational check can be verified using two Sources with a Power
Meter and Power Sensor.
Requirements for Operational Check
The N5280A operational check measures the signal paths from the LO INPUT
to the LO OUTPUT (LO AUX) and each of the four internal mixers, using a
power divider. Internally, the LO signal is mixed with RF input signals supplied
through each of the RF INPUTS (A, B, C, and D) and measured at each of the IF
OUTPUTS (A, B, C, and D). The following process demonstrates that all
associated switches, connectors, cables and circuitry are operational.
Required Hardware
To demonstrate that the N5280A is operating properly requires external
equipment - the same equipment that would be used to perform a field
calibration of the N5280A in a system. This external equipment includes two
precision signal generators and a power meter with a power sensor and power
sensor cable. The module interconnect cables are not used when performing
this operational check; instead, two high-quality flexible 3.5 mm cables are
needed along with adapters.
Please refer to the following table for recommended equipment.
Table 14
Keysight Recommended Equipment
Equipment
Description
E8257D-532 or E8267D-532 or
equivalent
PSG #1 and PSG #2
Precision Signal Generator (250 kHz to 31.8 GHz)
N1913A or N1914A or equivalent
Single/Dual Channel Power Meter
N8485A Option 100 or equivalent
10 MHz to 26.5 GHz Power Sensor
11730A or equivalent
Power Sensor Cable
Содержание N5280A
Страница 32: ...32 Keysight N5280A User s and Service Guide N5280A Operational Check Figure 21 LO AUX Output...
Страница 34: ...34 Keysight N5280A User s and Service Guide N5280A Operational Check Figure 22 IF Config...
Страница 50: ...50 Keysight N5280A User s and Service Guide N5280A Regulatory Information...
Страница 55: ...Installation Note Xxxxx xxxxx 3...