12 Getting Started Guide
Introduction
Overview
Figure 1-3
Overall block diagram of the RFIO board
The diagram above shows signal routing through the RFIO board (it is
simplified, omitting certain paths used for reference or calibration signals).
In the E7515E, a maximum of eight RF ports can be used at a time. All eight
can be transmit ports, provided no ports are being used as receive ports. A
maximum of four ports at a time can be used as receive ports.
Содержание E7515B UXM 5G
Страница 1: ...Getting Started Guide Keysight Wireless Test Platform E7515B UXM 5G Wireless Test Platform...
Страница 4: ...4...
Страница 8: ...8 Getting Started Guide Contents...
Страница 26: ...26 Getting Started Guide Introduction UXM 5G Software Applications...
Страница 44: ...44 Getting Started Guide Quick Start Anti virus Protection and Firewalls...
Страница 48: ...48 Getting Started Guide Control Panel Functions The Control Panel...
Страница 70: ...70 Getting Started Guide HCCU Functions UXM Arrays...
Страница 86: ...86 Getting Started Guide Front and Rear Panel Functions Front and Rear Panel Symbols...
Страница 104: ...104 Getting Started Guide Test Platform Operating System Updating the Keysight 5G NR Test Application...