Getting Started Guide 35
Quick Start
Turning On the Test Platform the First Time
9.
Select a scenario.
In the HCCU, on the Scenarios tab,
select a testing scenario (such as
NR5GFormatOpt03_RF) and click the
Activate icon. Wait while the selection
is set up (an "in progress" message is
displayed while the scenario is being
activated).
10.
Run the test
application.
Activate the test application by
double-clicking on the 5G NR Test App
icon on the desktop. (There is a lengthy
delay while the software loads.)
11.
Run the HCCU.
Activate the Keysight NES Hardware
Configuration Control Utility by
double-clicking the Keysight HCCU
icon on the desktop. (This utility runs
within a browser window.)
12.
Wait for the
application to
load.
Later in the loading process, a
splash-screen is displayed (with a
progress indicator).
Step
Action
Notes
Содержание E7515B UXM 5G
Страница 1: ...Getting Started Guide Keysight Wireless Test Platform E7515B UXM 5G Wireless Test Platform...
Страница 4: ...4...
Страница 8: ...8 Getting Started Guide Contents...
Страница 26: ...26 Getting Started Guide Introduction UXM 5G Software Applications...
Страница 44: ...44 Getting Started Guide Quick Start Anti virus Protection and Firewalls...
Страница 48: ...48 Getting Started Guide Control Panel Functions The Control Panel...
Страница 70: ...70 Getting Started Guide HCCU Functions UXM Arrays...
Страница 86: ...86 Getting Started Guide Front and Rear Panel Functions Front and Rear Panel Symbols...
Страница 104: ...104 Getting Started Guide Test Platform Operating System Updating the Keysight 5G NR Test Application...