![Keston Combi 30 Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/keston/combi-30/combi-30_installation-and-servicing-instructions_1958074045.webp)
45
SERVICING
Keston Combi -
Installation and Servicing
54 gAs CONTROL VALVE REpLACEMENT
1.
Refer to Frame 45.
2.
Unplug the electrical plug connection from the
gas control valve and disconnect the earth wire.
3.
Undo the union nut on the outlet of the gas
control valve.
4.
Undo the gas inlet pipe union at the inlet to the
gas control valve.
5.
Loosen the back nut retaining the valve to the
bracket and withdraw the valve forwards.
6.
Fit the new gas control valve ensuring the two
sealing washers are in place and reconnect gas
and electrical connections.
7.
Check operation of the boiler. Refer to Frame
36.
2
4
5
53 spARK gENERATOR REpLACEMENT
1.
Refer to Frame 45.
2.
Disconnect the leads from the spark
generator.
3.
Remove the M5 screws securing the
spark generator to the boiler chassis.
4.
Fit the new spark generator and re-
assemble in reverse order ensuring
the two earth leads are correctly
replaced.
5.
Check operation of the boiler. Refer
to Frame 36.
Spark Generator
3
3
2
2
4
3
s
ER
VICIN
g
207895-2.indd 45
02/01/2013 09:38:41
Содержание Combi 30
Страница 2: ...2 Keston Combi Installation and Servicing...
Страница 65: ...65 Short list of parts Keston Combi Installation and Servicing...
Страница 66: ...Gas Safe Register ID Number...