ABC 040104
2-1
SECTION 2 - INSTALLATION
2.1
UNPACKING AND INSPECTION
This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After careful unpacking, inspect for shipping damage before attempting to operate.
Perform the preliminary operational check as outlined in PAR. 2.5. If any indication of damage is
found, file an immediate claim with the responsible transport service.
2.2
TERMINATIONS AND CONTROLS
a) Front Panel: Refer to Figure 2-1 and Table 3-1.
b) Rear Panel: Refer to Figure 2-2 and Table 2-1.
FIGURE 2-1. ABC SERIES FRONT PANEL
FIGURE 2-2. ABC SERIES REAR PANEL
Содержание ABC 10-10DM
Страница 2: ......
Страница 6: ......
Страница 14: ...viii ABC 040104 FIGURE 1 1 ABC SERIES POWER SUPPLY...
Страница 18: ...1 4 ABCOPR040104 FIGURE 1 1 ABC SERIES POWER SUPPLY MECHANICAL OUTLINE DRAWING...
Страница 19: ...ABCOPR040104 1 5 FIGURE 1 2 ABC POWER SUPPLY AND RA 71 RACK ADAPTER OUTLINE DRAWING...
Страница 20: ...1 6 ABCOPR040104 FIGURE 1 3 TWO ABC POWER SUPPLIES AND RA 72 RACK ADAPTER OUTLINE DRAWING...
Страница 24: ......
Страница 58: ......
Страница 64: ......
Страница 94: ......
Страница 96: ...FOLD HERE Please place stamp here KEPCO INC 131 38 SANFORD AVE FLUSHING NY 11352 USA CUT HERE...