ABC 040104
3-19
3.7.3.6
OUTPUT SUBSYSTEM
This subsystem controls the power supply's voltage and current outputs
3.7.3.7
PROTECTION SUBSYSTEM
This subsystem allows overvoltage/overcurrent protection tripping to be delayed to prevent brief
transients (caused by application of power to a reactive load) from tripping overvoltage/overcur-
rent protection.
3.7.3.8
STATUS SUBSYSTEM
This subsystem programs the power supply status register. The power supply has two groups of
status registers: Operation and Questionable. Each group consists of three registers: Condition,
Enable, and Event.
3.7.3.9
TRIGGER SUBSYSTEM
This subsystem controls the remote triggering of the power supply.
3.7.3.10 [SOURCE:]VOLTAGE AND [SOURCE:]CURRENT SUBSYSTEMS
These subsystems program the output voltage and current of the power supply.
3.7.3.11
CALIBRATE SUBSYSTEM
The ABC series of power supplies support software calibration. A full calibration consist of a
voltage calibration and a current calibration. Both voltage and current calibrations consist of a
zero and a full scale calibration. There are two ways to perform the calibration: locally using the
front panel keys, or remotely sending commands through the GPIB bus. These two ways cannot
be combined.
In order to enter the calibration mode the correct calibration access code (password) must be
entered. If the password has been forgotten call the factory and a secret password (which has
been assigned to your power supply) will be provided. During the calibration, new calibration
data is computed which is than stored in the non volatile memory.
The following equipment is required for calibration: Digital Voltmeter (DVM) with 6 digits Dc
accuracy. Shunt 0.1 Ohm, 0.04%, minimum 15A, power > 50W (100W recommended)
Because the voltage measured will be used as reference for calibration, the DVM itself must be
calibrated accurately. During voltage calibration, the voltage, overvoltage and voltage readback
are calibrated and during current calibration the current, overcurrent and current readback are
calibrated. The normal procedure is to calibrate voltage first and then current. However, you do
not have to do a complete calibration each time. If required, you may calibrate only the voltage
or the current and then proceed to saving the calibration results. For voltage calibration all loads
must be disconnected and the sense terminals connected to the corresponding output termi-
nals. The digital voltmeter will be connected to the output of the power supply. For current cali-
bration after disconnecting all loads an appropriate shunt resistor will be connected across
output terminals and the digital voltmeter will be connected across the sense terminals of the
shunt resistor.
3.7.3.12 INSTRUMENT SUBSYSTEM
This subsystem controls the power supply's voltage and current outputs and allows compatibil-
ity with other vendor’s products
Содержание ABC 10-10DM
Страница 2: ......
Страница 6: ......
Страница 14: ...viii ABC 040104 FIGURE 1 1 ABC SERIES POWER SUPPLY...
Страница 18: ...1 4 ABCOPR040104 FIGURE 1 1 ABC SERIES POWER SUPPLY MECHANICAL OUTLINE DRAWING...
Страница 19: ...ABCOPR040104 1 5 FIGURE 1 2 ABC POWER SUPPLY AND RA 71 RACK ADAPTER OUTLINE DRAWING...
Страница 20: ...1 6 ABCOPR040104 FIGURE 1 3 TWO ABC POWER SUPPLIES AND RA 72 RACK ADAPTER OUTLINE DRAWING...
Страница 24: ......
Страница 58: ......
Страница 64: ......
Страница 94: ......
Страница 96: ...FOLD HERE Please place stamp here KEPCO INC 131 38 SANFORD AVE FLUSHING NY 11352 USA CUT HERE...