KL25164
–
Chuck Installation Manual
Page
11
of
12
Last Updated 21/12/2022 16:17 PM
4.2 VISY Chuck Measurements
VISY Chuck 1
st
Op Roller Gap Measurements
When adjusting the roll height and gap settings for the 1st operation roller for a VISY chuck refer to
the image below to determine where the feeler gauge should be placed and which surfaces on the
chuck and rollers the measurements are taken from.