7 - INSTALLATION AND START UP
min 600
A
B
Heat recovery extraction
Model
A (mm) B (mm)
1500DX1
550
450
2300DX1
650
500
3100DX1
700
550
7.3 PRELIMINARY INFORMATION
• Work while meeting the current safety regulations, ensuring sufficient
space to move and the cleanliness of jobsite.
• Wear protective clothing and personal protective equipment (glasses,
gloves, etc.).
• Move the packed section as close as possible to the place of installation.
• Don't place tools or other jobsite equipment over the packed unit.
• Don't use the unit as a store of yard tools.
• Don't touch moving parts and don't use them as supports.
• Check the full integrity of all unit components.
7.4 INSTALLATION LOCATION
• Make sure that the support surface is able to support the weight of
the unit(units) and will not cause vibrations.
• Make sure that the support surface is perfectly horizontal so as to
Allow the correct coupling of the various
sections.
• Never position the unit in rooms where there are flammable gases
or acidic, aggressive or corrosive substances that may irreparably
damage the various components.
• Leave a minimum amount of free space around the unit, as shown
in the figure, so as to allow for installation,
maintenance and the replacement of components, such as coils, filters etc. (fig. 5).
• If the unit is hung from the ceiling all the sections that make up the
air handling unit must be connected to the
ceiling.
fig. 5
pag. 17
Содержание KRE-1500DX1
Страница 1: ...KRE 1500DX1 KRE 2300DX1 KRE 3100DX1 INSTALLATION USER MAINTENANCE MANUAL Cross flow heat recovery ...
Страница 43: ... 13 SPARE PARTS pag 43 ...
Страница 45: ...NOTES ...
Страница 46: ...NOTES ...
Страница 47: ......
Страница 48: ......