Contents
6.9
Specifying Qualification Study Conditions ................................................................. 76
6.10 Reviewing and Changing the Setup ............................................................................. 77
Chapter 7. Calibrating and Verifying Sensors
7.1
Introduction .................................................................................................................. 79
7.2
Loading a Setup into the Validator .............................................................................. 80
7.3
Selecting Sensors ......................................................................................................... 82
7.4 Calibrating or Verifying Sensors.................................................................................. 83
7.4.1 Automatic, Semi-Automatic or Manual Mode ................................................. 84
7.4.2 Calculate Stability ............................................................................................. 85
7.4.3 Calculate Deviation of Uncalibrated Sensors ................................................... 85
7.4.4 Calculate Deviation of Calibrated Sensors ....................................................... 85
7.4.5 Data Logging Complete at Setpoint .................................................................. 86
7.4.6 The Graph View................................................................................................ 86
7.5 Current Calibration and Hardware Connections .......................................................... 87
7.5.1 Reasons for Calibration Failure ........................................................................ 88
7.5.2 Completing Calibration ..................................................................................... 88
Chapter 8. Viewing Live Data
8.1 Select Validator ............................................................................................................ 89
8.2 Monitoring Live Data ................................................................................................... 91
8.3 Check Communications Connections .......................................................................... 97
8.4 Select a Temperature Standard ..................................................................................... 98
8.5 Changing the IRTD Address ........................................................................................ 98
Chapter 9. The Qualification Study
9.1 Introduction .................................................................................................................. 99
9.2 Load a Setup ............................................................................................................... 101
9.2.1 Select a Setup File........................................................................................... 101
9.3 Viewing the Active Qualification Study .................................................................... 104
9.4 Graph Real-Time Sensor Readings and Calculations ................................................ 106
Kaye Validator User’s Manual
v
Содержание Validator AVS
Страница 1: ...Validation Kaye Validator AVS User s Manual Kaye Validator User s Manual...
Страница 2: ...Kaye Validator AVS Thermal Process Validation System User s Manual M5100 EN Rev A May 2015...
Страница 3: ...No content intended for this page Kaye Validator User s Manual...
Страница 104: ...Chapter 9 The Qualification Study 9 2 1 Select a Setup File cont Kaye Validator User s Manual 97...
Страница 133: ...Chapter 10 Generating Reports 126 Kaye Validator User s Manual...
Страница 138: ...Chapter 10 Generating Reports Kaye Validator User s Manual 131...
Страница 147: ...Chapter 10 Generating Reports 140 Kaye Validator User s Manual...
Страница 167: ...No content intended for this page...