42
43
Installation steps
1.Take off the packing box cover and take out the components
2.Place the crate upright and take out the control center
3.Install the anti-tipping support in front of the device and fix well with screws (M4*20_3) on
both sides.
5.Using the connector, install the beam on the support and fix it well with screws (M8*20)
6.Remove the screws on the Control Center's top back plate.
7.Place the support structure on the top back plate and fix well with 5 M4*20 screws in the
front and 4 M8*20 screws with gaskets at the side.
4.Remove the screws from the top sealing plate of the beam and open it.