INITIAL INSTALLATION MANUAL
AF INTEGRA / AF-H INTEGRA
PAGE: 30
JUN 01/2011
Remark: The number of flashes gives an indication of the faulty
parameter detected during the self-test.
B. RCP operational tests
Check correct operation of RCP LED
annunciator by switching ELT and RCP as
described in the sequential procedure
Figure
23: RCP LED operation
(with ELT switch in the
"ARM" position).
Figure 23: RCP LED operation
3+1 LOW BATTERY VOLTAGE
3+2 LOW RF POWER
3+3 FAULTY VCO LOCKING (FAULTY FREQUENCY)
3+4 NO IDENTIFICATION PROGRAMMED
3+5 FAULTY VSWR (EXT. ANTENNA)
3+6 GPS SERIAL LINK (ELT internal check)
If self-test fails, contact the distributor as soon as possible.
Unless a waver is granted, flight should be cancelled.
Содержание AF INTEGRA
Страница 27: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 23 JUN 01 2011 Figure 19 RC102 mounting diagram ...
Страница 42: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 38 JUN 01 2011 Figure 30 RC102 Outline dimensions ...
Страница 43: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 39 JUN 01 2011 Figure 31 RC200 Outline Dimensions ...
Страница 44: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 40 JUN 01 2011 Figure 32 RC300 Outline Dimensions ...
Страница 45: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 41 JUN 01 2011 Figure 33 RC600 Outline dimensions ...
Страница 53: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 49 JUN 01 2011 Figure 41 RC102 Wiring diagram ...
Страница 54: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 50 JUN 01 2011 Figure 42 RC200 Wiring diagram ...
Страница 55: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 51 JUN 01 2011 Figure 43 RC300 Wiring diagram ...
Страница 56: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 52 JUN 01 2011 Figure 44 RC600 Wiring diagram ...
Страница 59: ......