INITIAL INSTALLATION MANUAL
AF INTEGRA / AF-H INTEGRA
PAGE: 28
JUN 01/2011
7. Outside Buzzer Installation
• Drill 3 x Ø 3mm holes according to drilling mask (
Refer to Figure 28:
Outside buzzer, Outline dimensions
);
• Fix the mounting tray (1) with 3 M3 screws and nuts or with 3 rivets;
• Install the buzzer (2) on the into the mounting tray and tighten plastic
nut (3) (maximum torque on plastic nut: 6Nm);
• Crimp the Fast-On terminals (4) on the wires;
• Wrap the Fast-On terminals with heat shrinkable sleeve (5) (25 mm);
• Using clamps (6), fix the wires on the mounting tray;
• Affixed the label (7) on the wires.
Figure 21: Buzzer installation
Содержание AF INTEGRA
Страница 27: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 23 JUN 01 2011 Figure 19 RC102 mounting diagram ...
Страница 42: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 38 JUN 01 2011 Figure 30 RC102 Outline dimensions ...
Страница 43: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 39 JUN 01 2011 Figure 31 RC200 Outline Dimensions ...
Страница 44: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 40 JUN 01 2011 Figure 32 RC300 Outline Dimensions ...
Страница 45: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 41 JUN 01 2011 Figure 33 RC600 Outline dimensions ...
Страница 53: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 49 JUN 01 2011 Figure 41 RC102 Wiring diagram ...
Страница 54: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 50 JUN 01 2011 Figure 42 RC200 Wiring diagram ...
Страница 55: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 51 JUN 01 2011 Figure 43 RC300 Wiring diagram ...
Страница 56: ...INITIAL INSTALLATION MANUAL AF INTEGRA AF H INTEGRA PAGE 52 JUN 01 2011 Figure 44 RC600 Wiring diagram ...
Страница 59: ......