Kampmann 32611641111100 Скачать руководство пользователя страница 6

KaDeck

Assembly instructions

6

4.4

Connection positions

Differential pressure-independent valve,

2-pipe

Heating or cooling

Heating and cooling

Heating or cooling

Heating and cooling

2-way valve, 2-pipe

Differential pressure-independent valve,

4-pipe

2-way valve, 4-pipe

Connection positions

1

Cooling supply (also heating with 2-
pipe systems)

2

Cooling return (also heating with 2-pipe
systems)

3

Cooling return (also heating)

4

Heating supply

5

Heating return

6

Heating return

5

Pre-commissioning checks

Before initial commissioning, check whether all the necessary conditions have been met so that
the unit can function safely and properly.

Electrical tests

Check whether all lines have been properly laid.

Check whether all lines have the necessary cross-section.

Are all wires connected in accordance with the electric wiring diagrams?

Is the earth wire connected and wired throughout?

Check all external electrical connections and terminal connections are fixed in place and
tighten if necessary.

Check whether DIP switches have been correctly set in accordance with the wiring diagram.

Water-side checks

Check whether all supply and drainage lines have been properly connected.

Fill pipes and unit with water and bleed.

Check whether all bleed screws are closed.

Check leak tightness (pressure test and visual inspection).

Check whether the parts carrying water have been flushed through.

Check whether any shut-off valves fitted on site are open.

Check whether any electrically actuated shut-off valves have been properly connected.

Check whether all valves and actuators are working properly (note permitted mounting pos-
ition).

Condensation water connection

Check whether the condensation tray is free of building rubble.

Check the condensation drain and operation of the alarm signal on the condensation pump.

Check whether the cooling valve switches off in the event of an alarm signal.

Check whether the unit is connected leak-free to the on-site condensation connection.

Check whether the waste water lines are clean and have a sufficient gradient.

Check whether the condensation pump has a working power supply.

6

Maintenance

6.1

Cleaning the condensate tray

Remove the condensate tray.

Clean the condensate tray.

6.2

Replacing the filter.

CAUTION!
Risk of injury from sharp metal housing!

The inner metal of the casing can have sharp edges.

Wear suitable protective gloves.

Remove the filter.

Vacuum the filter and re-fit it after cleaning.

Содержание 32611641111100

Страница 1: ...Betriebsgrenzen Wassertemperatur min max C 4 80 Luftansaugtemperatur min max C 6 40 Luftfeuchte min max 20 60 Betriebsdruck min bar kPa Betriebsdruck max bar kPa 16 1600 Glykolanteil min max 0 50 Bet...

Страница 2: ...erwenden Verpackungen erst kurz vor der Montage entfernen 4 Montage und Anschluss 4 1 Voraussetzungen an den Aufstellort Das Ger t nur montieren wenn folgende Bedingungen erf llt sind Die Wand Decke m...

Страница 3: ...ob alle Zu und Ablaufleitungen ordnungsgem ausgef hrt sind Rohrleitungen und Ger t mit Wasser f llen und entl ften Pr fen ob alle Entl ftungsschrauben geschlossen sind Dichtigkeit pr fen Abdr cken un...

Страница 4: ...ts of operation Min max water temperature C 4 80 Min max air intake temper ature C 6 40 Min max air humidity 20 60 Min operating pressure bar kPa Max operating pressure bar kPa 16 1600 Min max glycol...

Страница 5: ...ing Only use the holding points provided Only remove packaging shortly before assembling the unit 4 Installation and wiring 4 1 Requirements governing the installation site Only install and assemble t...

Страница 6: ...all supply and drainage lines have been properly connected Fill pipes and unit with water and bleed Check whether all bleed screws are closed Check leak tightness pressure test and visual inspection...

Страница 7: ...e d eau min max C 4 80 Temp rature d aspiration d air min max C 6 40 Humidit de l air min max 20 60 Pression de fonctionnement min bar kPa Pression de fonctionnement max bar kPa 16 1600 Proportion de...

Страница 8: ...tenir compte des symboles et indications figurant sur l emballage Utiliser uniquement les points de fixation pr vus cet effet Attendre le moment du montage pour retirer l emballage 4 Montage et racco...

Страница 9: ...t Contr les c t eau V rifier que toutes les conduites d amen e et d vacuation sont mont es correctement Remplir et purger les tuyaux et l appareil d eau V rifier que toutes les vis de purge sont ferm...

Страница 10: ...n max C 4 80 Temperatura dell aria aspirata min max C 6 40 Umidit dell aria min max 20 60 Pressione di esercizio min bar kPa Pressione di esercizio max bar kPa 16 1600 Percentuale di glicole min max 0...

Страница 11: ...izzare solo i punti di aggancio previsti Rimuovere gli imballaggi solo poco prima del montaggio 4 Montaggio e collegamento 4 1 Requisiti per il luogo di installazione Montare l apparecchio solo se le...

Страница 12: ...alimentazione e di scarico sono realizzate correttamente Riempire di acqua e sfiatare le tubazioni e l apparecchio Verificare se tutte le viti di sfiato sono chiuse Controllare la tenuta mediante cad...

Страница 13: ...igtemperatuur min max C 6 40 Luchtvochtigheid min max 20 60 Bedrijfsdruk min bar kPa Bedrijfsdruk max bar kPa 16 1600 Glycolpercentage min max 0 50 Bedrijfsspanning 230 V 50 60 Hz Vermogensopname stro...

Страница 14: ...rvoor bestemde aanslagpunten Verwijder verpakkingen pas kort v r de montage 4 Montage en aansluiting 4 1 Voorwaarden voor de opstelplaats Monteer het apparaat alleen wanneer aan de volgende voorwaarde...

Страница 15: ...nvoer en afvoerleidingen goed zijn aangelegd Vul de leidingen en het apparaat met water en ontlucht deze Controleer of alle ontluchtingsschroeven gesloten zijn Voer een lektest uit afdrukken en visuel...

Страница 16: ...e min maks C 6 40 Wilgotno powietrza min maks 20 60 Ci nienie robocze min bar kPa Ci nienie robocze maks bar kPa 16 1600 Zawarto glikolu min maks 0 50 Napi cie robocze 230 V 50 60 Hz Pob r mocy pr du...

Страница 17: ...wek na opakowaniu Stosowa wy cznie punkty mocowania przeznaczone do tego celu Opakowanie zdj dopiero bezpo rednio przed monta em 4 Monta i pod czenie 4 1 Wymagania wzgl dem miejsca monta u Urz dzenie...

Страница 18: ...odnie ze schematem po cze Kontrola po stronie wody sprawdzi czy wszystkie przewody dop ywowe i odp ywowe s prawid owo wykonane Rury oraz urz dzenie nape ni wod i odpowietrzy sprawdzi czy wszystkie rub...

Страница 19: ...1 1 2 3 4 5 6 7 KaDeck 1 2 3 4 5 6 7 2 QR EN 60335 1 2 1 2 2 19 2 2 C 4 80 C 6 40 20 60 16 1600 0 50 230 50 60 2 3 Kampmann GmbH Co KG Friedrich Ebert Str 128 130 49811 Lingen Ems T 49591 7108 0 E in...

Страница 20: ...KaDeck 20 2 4 VDE DIN EN VDI 6022 B C 2 5 3 3 1 Kampmann 2 4 4 1 4 2 2 2 2 3 4 3 1 M8 2 M8 3 4 5 90 6 23...

Страница 21: ...KaDeck 21 4 4 2 2 2 4 2 4 1 2 2 2 3 4 5 6 5 DIP...

Страница 22: ...KaDeck 22 6 6 1 6 2...

Страница 23: ...23 1 31 1 24 4 7 7 7 7 790 620 195 195 2 3 4 5 6...

Страница 24: ...24 7 8...

Отзывы: