Description
Figure
Discharge port side panel
1
HB 1300 PI pr = 831699.0
HB 1600 PI pr = 831705.0
➤ In order to run the electric cables of the ma‐
chine to the exterior, remove the cover of
the cable feed-through at the side panel of
the discharge port
1
.
➤ Flushly install the precut foam insert of the
discharge port's side panel and the T-con‐
nector.
➤ Align the cut-out for the pass-through of the
pressure line in the center.
➤ Note the distance of the outside position
1
to the center of the machine foot.
Corner panel
2
and
3
= 888442.1
➤ Position the corner panel with installed
hinge components
2
and the corner panel
without hinge components
3
in such a man‐
ner that the square end pads are placed on
the floor.
➤ From the inside, attach the corner panels
with the short sides with 4 hex-head
screws
50
each to the discharge port side
panel.
Do not fully tighten the screws.
Lower side panels
4
= 888452.1
➤ From the inside, install 2 lower side pan‐
els
4
at the long sides of the corner panels
with 4 hex-head screws
50
each.
Do not fully tighten the screws.
Instrument corner panel
5
= 888448.2
➤ Place the instrument corner panel with in‐
stalled hinge components
5
in such a man‐
ner that the square pads are placed on the
floor.
➤ From the inside, attach the corner panel
with the long side with 4 hex-head
screws
50
at the lower side panel.
Do not fully tighten the screws.
6
Installation
6.10 Options
Number: 9_9572 28 USE
Installation and Operating Manual Rotary lobe blower
HBPI pr
49