If additional failure safety is desirable, the KACO devices can also be arranged in a ring via a correspondingly configured
Network Segment Switch
(that supports the Rapid Spanning Tree Protocol "RSTP"). This switch is then also coupled
to the
Segment Controller
. This configuration is shown as an example in segments 1 and M.
As can be seen in the figure, a
string combiner
is assigned to each KACO device. In terms of communication, these
are coupled in directly to the device via an RS485 cable (green cable). MODBUS RTU is used as the communication proto-
col for this purpose. The monitoring of the
string combiner
is also carried out via the
Segment Controller
,
whereby the KACO device undertakes the role of a MODBUS gateway. The
string combiner
must be coupled using a
KACO blueplanet ARGUS.
The only 3rd party
string combiner
device currently available, which can also be addressed in this manner via the
Segment Controller
, comes from “Kernel Sistemi”.
Depending on the network load, the blueplanet 87.0-150TL3 can support up to 10 Modbus clients.
8.4
Start-up options
Option 1:
Local, guided start-up by means of WIFI or LAN connection
Installation technician connects to a KACO inverter via
WIFI
Installation wizard carries out start-up steps interac-
tively.
Option 2:
Local start-up with pre-arranged configuration
Installation technician uses a USB memory stick that con-
tains a pre-prepared device configuration.
The device imports these settings and is then ready for
operation.
Option 3:
Start-up in a network without Segment Controller
Start-up in an existing network
The installation technician can start up the device with
the aid of the installation wizard as described at option
1. The device can be addressed using its host name.
Option 4:
Centralised start-up via Segment Controller
A device configuration that is available on the Segment
Controller can be uploaded to several KACO inverters.
The devices are ready for operation once the configura-
tion is activated.
Option 5:
Centralised start-up via Plant Controller
Available in future development levels.
A device configuration that is available on the Plant Con-
troller can be uploaded to the relevant devices via the
subordinate Segment Controllers.
Tab. 3:
Start-up variants for individual devices/plant segments/overall plant
Following successful authorisation and selection of the main menu option - Configuration , the installation wizard is
opened directly (if the device is still on the factory defaults and commissioning has not yet been carried out).
The installation wizard can still be relaunched at a later stage to make further changes to the original configuration.
The installation process currently consists of 9 steps that are outlined below.
Step 1: Language selection
↻
The installation wizard has been started or re-started.
1 Select
Menu language
via the dropdown menu.
2 Confirm the action field.
»
Pressing the
Next
button will take you to the next installation step.
Fig. 41:
Menu item: Configuration
via web user interface [See sec-
tion 9.4.2
KACO blueplanet 87.0 TL3 KACO blueplanet 92.0 TL3 KACO blueplanet 110 TL3 KACO blueplanet 125 TL3
KACO blueplanet 137 TL3 KACO blueplanet 150 TL3
Page 35