
26
INSTALLATION (Phase Three)
Install DKX-10/DKX-19 Lock Strike
Note:
It is recommended to install the
DKX
Series Strike (Type 2) first, followed by the lock installation.
A.
Locate the strike horizontal centerline off the lock horizontal centerline, and mark a horizontal line on the
strike mounting surface.
B.
Position the strike edge, 1/8" (.12") away from the face of the door while flat against the strike mounting surface
(
See Figure 1.
) centered on the horizontal centerline. The Qty.-2 Shims
(515064)
can be used for the (.12") spacing,
they are each .060" thick, two is (.12").
C.
Mark lines, and/or scribe the centers of the two slotted hole locations, mid-slot.
D.
Now punch this center in preparation for drilling.
E.
Drill and tap the two slotted hole locations for attaching screws. (No. 25 drill, .149" diameter for the #10 thread
forming screws. No. #21 drill, .159" dia. for the #10 machine screws)
Figure
1
26
Содержание DKX Series
Страница 1: ...Kaba Mas LLC DKX Series Type III Installation Instructions June 16 2020 550 1026 REV B June 2020...
Страница 37: ...NOTES...
Страница 38: ...NOTES...