20
Insert the MK3 slot nut of the pre-assembled mid clamps into the
top channel on CrossRail. While slightly lifting the plastic tabs,
rotate 90 degrees clockwise to engage the MK3 into the channel.
Attach the mid clamps to the module at the specified locations
per the PV module manufacturer’s installation instructions.
Torque: 12 ft-lbs.
Ensure the modules are flush against the clamp, and torque.
Important: Verify module manufacturer’s recommended torque
specification to ensure clamps are compatible.
Materials required: Mid Clamp Set
14
ATTACH MID CLAMPS
15
OPTIONAL: ATTACH END CAPS
Push the pins of the appropriate sized end cap into the end of the
rail.
Materials required: End Caps
Содержание Everest CrossRail 44-X
Страница 22: ...22 Notes ...
Страница 23: ...23 Notes ...