41
40
41
Lifting the truck by crane
Requirements
– Truck parked securely, see page 58.
Tools and Material Required
– Two ring screws, for capacity details refer to the truck data plate.
– Crane slings, for capacity details refer to the truck data plate.
Procedure
• Remove the dummy plugs from the load section and screw in the two ring screws
(40).
• Insert load hooks on either side of the ring screws.
• Secure the load hooks to the strap points (41).
• Raise and load the truck.
• Lower and deposit the truck carefully (see page 58).
• Secure the truck with wedges to prevent it from rolling away.
• Remove the load hooks and unscrew the ring screws.
This concludes the loading by crane.
28
02.21 en-GB
Содержание ESE 533
Страница 1: ...ESE 533 03 10 Operating instructions 51157401 02 21 en GB ESE 533...
Страница 2: ...2...
Страница 4: ...4 02 21 en GB...
Страница 19: ...19 02 21 en GB...
Страница 24: ...Item Component 23 Truck data plate 24 Final inspection 25 Company name 26 Test plaque 24 02 21 en GB...
Страница 32: ...32 02 21 en GB...
Страница 43: ...2 Displays and Controls 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 43 02 21 en GB...
Страница 115: ...126 129 128 127 130 144 142 143 140 141 138 139 136 134 133 135 132 131 137 115 02 21 en GB...
Страница 124: ...124 02 21 en GB...