
Transporting load units
Requirements
– Good ground conditions.
Procedure
• Accelerate gradually.
• Travel at a constant speed.
• Transport the load unit as low as possible above the ground outside the rack aisle.
Check the ground clearance.
Setting down the load
Requirements
– Storage location suitable for storing the load.
Procedure
• Drive carefully up to the storage location.
• Press the soloPILOT lever (60).
Z
The lowering speed is fixed and cannot be adjusted.
• Carefully lower the load handler so that the fork arms are clear of the load.
• Carefully remove the fork arms from the pallet.
The load unit is now lowered.
69
02.21 en-GB
Содержание ESE 533
Страница 1: ...ESE 533 03 10 Operating instructions 51157401 02 21 en GB ESE 533...
Страница 2: ...2...
Страница 4: ...4 02 21 en GB...
Страница 19: ...19 02 21 en GB...
Страница 24: ...Item Component 23 Truck data plate 24 Final inspection 25 Company name 26 Test plaque 24 02 21 en GB...
Страница 32: ...32 02 21 en GB...
Страница 43: ...2 Displays and Controls 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 43 02 21 en GB...
Страница 115: ...126 129 128 127 130 144 142 143 140 141 138 139 136 134 133 135 132 131 137 115 02 21 en GB...
Страница 124: ...124 02 21 en GB...