099
9.G
B
F 8
6
Notes on maintenance
6.1
Preparation of the truck for servicing and maintenance operation
All required safety measures must be taken to prevent any accidents in the course of
the servicing and maintenance operations. The following preparatory operations
must be performed:
– Park the truck and render it safe (refer to chapter E).
– Disconnect the battery connector to prevent accidental or unauthorised truck ope-
ration.
f
When work has to be performed under the jacked-up truck, suitable measures must
be taken to prevent any dropping, tilting or slipping of the truck. When lifting the truck,
the instructions included in chapter “Transportation and Commissioning” have to be
observed.
6.2
Open the battery hood
See chapter D.
6.3
Open the front hood
– Turn the control shaft to the truck outer edge or incline it slightly.
– Release the hood locking mechanism (1); the key (2) can be found in the battery
compartment.
– Raise the hood (3) and place it next to the truck.
A
Mounting is performed in reverse order
.
1
4
3
2
5
099
9.G
B
F 8
6
Notes on maintenance
6.1
Preparation of the truck for servicing and maintenance operation
All required safety measures must be taken to prevent any accidents in the course of
the servicing and maintenance operations. The following preparatory operations
must be performed:
– Park the truck and render it safe (refer to chapter E).
– Disconnect the battery connector to prevent accidental or unauthorised truck ope-
ration.
f
When work has to be performed under the jacked-up truck, suitable measures must
be taken to prevent any dropping, tilting or slipping of the truck. When lifting the truck,
the instructions included in chapter “Transportation and Commissioning” have to be
observed.
6.2
Open the battery hood
See chapter D.
6.3
Open the front hood
– Turn the control shaft to the truck outer edge or incline it slightly.
– Release the hood locking mechanism (1); the key (2) can be found in the battery
compartment.
– Raise the hood (3) and place it next to the truck.
A
Mounting is performed in reverse order
.
1
4
3
2
5
Содержание EJB 14
Страница 1: ...Operating instructions 50051981 EJB 14 16 G 06 99 09 99...
Страница 3: ...0108 GB...
Страница 7: ...0699 GB A 2...
Страница 11: ...0999 GB B 4 h4 h3 h1 l2 l1 l c y Q h s h8 b5 Ast W a B m2 20 5 h2 b4...
Страница 17: ...0999 GB B 10...
Страница 25: ......
Страница 28: ...E 3 0999 GB 2 1 3 4 5 6 6 8 9 10 7 11 12...
Страница 37: ...0999 GB E 12...