C Transportation and commissioning
1
Transportation by crane
f
Only use lifting equipment with sufficient bearing capacity (loading weight see identi-
fication label on truck).
A
A hoisting point (1) is provided at the hoist frame for loading the truck with the help of
hoisting gear.
– Park the truck and render it safe
(refer to chapter E).
– Attach the hoisting gear to the stop (1)
on the hoisting mast.
m
Secure the hoisting gear to the hoisting
points ensuring that the hoisting gear will
not slip! The hoisting gear must be atta-
ched in such a way that it does touch any
add-on parts while the truck is being lif-
ted.
2
First commissioning
m
The truck must only be operated on battery current. Rectified alternate current will da-
mage the electronics. Cables connected to the battery (towing cable) must be less
than 6 meters in length.
f
It is prohibited to hoist loads when the truck is operated via a towing cable with an
external battery.
In order to prepare the truck for work following delivery or transportation, the following
operations must be performed:
– Check whether the equipment is complete and in perfect condition.
– If required, mount the battery, make sure not to damage the battery cable
(see chapter D).
– Load the battery (see chapter D).
– If required, check whether the settings of the combined instrument correspond to
the battery (see chapter D).
– Commission the truck as prescribed
(see chapter E).
A
If the truck is parked for longer periods, the running surfaces of the wheels may be
flattened. However, this flattening will disappear quickly when the truck is being
driven.
1
C 1
099
9.G
B
C Transportation and commissioning
1
Transportation by crane
f
Only use lifting equipment with sufficient bearing capacity (loading weight see identi-
fication label on truck).
A
A hoisting point (1) is provided at the hoist frame for loading the truck with the help of
hoisting gear.
– Park the truck and render it safe
(refer to chapter E).
– Attach the hoisting gear to the stop (1)
on the hoisting mast.
m
Secure the hoisting gear to the hoisting
points ensuring that the hoisting gear will
not slip! The hoisting gear must be atta-
ched in such a way that it does touch any
add-on parts while the truck is being lif-
ted.
2
First commissioning
m
The truck must only be operated on battery current. Rectified alternate current will da-
mage the electronics. Cables connected to the battery (towing cable) must be less
than 6 meters in length.
f
It is prohibited to hoist loads when the truck is operated via a towing cable with an
external battery.
In order to prepare the truck for work following delivery or transportation, the following
operations must be performed:
– Check whether the equipment is complete and in perfect condition.
– If required, mount the battery, make sure not to damage the battery cable
(see chapter D).
– Load the battery (see chapter D).
– If required, check whether the settings of the combined instrument correspond to
the battery (see chapter D).
– Commission the truck as prescribed
(see chapter E).
A
If the truck is parked for longer periods, the running surfaces of the wheels may be
flattened. However, this flattening will disappear quickly when the truck is being
driven.
1
Содержание EJB 14
Страница 1: ...Operating instructions 50051981 EJB 14 16 G 06 99 09 99...
Страница 3: ...0108 GB...
Страница 7: ...0699 GB A 2...
Страница 11: ...0999 GB B 4 h4 h3 h1 l2 l1 l c y Q h s h8 b5 Ast W a B m2 20 5 h2 b4...
Страница 17: ...0999 GB B 10...
Страница 25: ......
Страница 28: ...E 3 0999 GB 2 1 3 4 5 6 6 8 9 10 7 11 12...
Страница 37: ...0999 GB E 12...