83
83
0
0
8
8
.
.
1
1
2
2
E
E
N
N
Positioning the integrated sideshift (option)
Positioning the integrated sideshift (option)
Requirements
Requirements
–
– Truck
Truck
prepared
prepared
for
for
operation,
operation,
(see
(see
"Preparing the truck for operation" on
"Preparing the truck for operation" on
pa
page
ge 68
68).
).
Procedure
Procedure
•• Pul
Pull the
l the SOL
SOLO-P
O-PILO
ILOT le
T lever
ver (11
(119) i
9) in dir
n direct
ection
ion
R to move the load handler
R to move the load handler to the right (from
to the right (from
the driver’s viewpoint).
the driver’s viewpoint).
•• Pu
Push t
sh the S
he SOL
OLO-
O-PI
PILO
LOT le
T leve
verr (1
(119
19) in
) in
direction V to move the load handler to the
direction V to move the load handler to the
left (from the driver’s viewpoint).
left (from the driver’s viewpoint).
The sideshifter is now positioned.
The sideshifter is now positioned.
Z
Z
When the limit position for the operation has been reached (there will be a noise
When the limit position for the operation has been reached (there will be a noise
from the pressure relief valve) release the lever. The lever will revert automatically
from the pressure relief valve) release the lever. The lever will revert automatically
to neutral.
to neutral.
R
R
V
V
119
119
https://www.besttruckmanuals.com/
Содержание DFG 540
Страница 3: ...0 0 8 8 1 1 2 2 E E N N 4 4 https www besttruckmanuals com...
Страница 13: ...0 0 8 8 1 1 2 2 E E N N 14 14 https www besttruckmanuals com...
Страница 21: ...0 0 8 8 1 1 2 2 E E N N 22 22 https www besttruckmanuals com...
Страница 39: ...0 0 8 8 1 1 2 2 E E N N 40 40 https www besttruckmanuals com...
Страница 111: ...111 111 0 0 8 8 1 1 2 2 E E N N https www besttruckmanuals com...
Страница 171: ...171 171 0 0 8 8 1 1 2 2 E E N N https www besttruckmanuals com...