23
© 2017, JUN-AIR
We reserve the right to make any alterations which may be due to any technical improvements
Printed in the USA
87R-4P Compressor System User Guide
6190900 (Rev B)
INSTALLATION CHECKLIST
o
Check system for shipping damage
o
Remove packaging cardboard
o
Verify installation kit components
o
Relocate unit to operating location and place per “SITE REQUIREMENTS”
o
Attach pneumatic fittings and connections per “SITE REQUIREMENTS” and
“PNEUMATIC CONNECTIONS”.
o
Attach electrical connections per “SITE REQUIREMENTS” and
“ELECTRICAL CONNECTIONS" requirements
o
Verify incoming line voltage meets minimum and maximum values
o
Turn on power to dedicated circuit and ensure unit starts. If not, refer to
“TROUBLESHOOTING GUIDE”
o
Perform system checks per “SYSTEM CHECKS AND TESTS”
Gast Manufacturing
P.O. Box 97
2300 M139 Highway
Benton Harbor, MI 49023-
0097
Ph: 269-926-6171
Fax: 269-925-8288
www.JUN-AIR.com
Gast Group Limited
c/o IDEX Trading (Shanghai) Co., LTD
Room 3502-3505
No. 1027 Chang Ning Road,
Zhaofeng Plaza
Shanghai, China 200050
Phone +86-21-52415599
Fax +86-21-52418339
Gast Group Ltd.
Unit 11, The I O Centre
Nash Road
Redditch, B98 7AS
United Kingdom
Phone +44 (0)1527-504040
Fax +44 (0)1527-525262