
– 30 –
(21) AT unit connection/disconnection
Procedures of disassembling/assembling
1. Remove the set screw
2
of the AT link unit (front)
1
and take out the second thread tension
3
. (Refer
to "(20) Second thread tension connection/disconnection.")
2. Draw out the cotter pin
6
from the pin block
5
of the AT link unit (rear)
4
. Be careful not to drop the
washer
7
at that time.
* Work becomes easier if the main shaft motor is removed.
3. Lift the joint block
8
of the AT unit upwards and take it off the pin block
5
of the AT link unit (rear)
4
.
4. Draw out the AT link unit (front)
1
from the plane side (in the direction of the arrow
E
) and remove it.
5. Remove the two set screws
9
and take out the AT solenoid unit
!0
.
6. For reassembly, follow the steps of 5. to 1. above.
Solenoid side
Close contact
Содержание LK-1900AN
Страница 30: ... 18 11 Hook adjustment Standard adjustment For DP 17 For DP 5 0 05 to 0 1 mm ...
Страница 97: ... 85 3 Thread tension area 4 Thread trimmer area Grease Grease JUKI Grease A Grease JUKI Grease A JUKI Grease A ...
Страница 100: ... 88 8 Needle thread clamp mechanism area Grease Grease Grease Grease Grease ...
Страница 101: ... 89 9 LK 1901AN relations Grease Grease Grease Grease Grease Grease Grease Grease ...
Страница 102: ... 90 10 LK 1903AN relations Grease Grease Grease ...
Страница 129: ... 117 12 Circuit diagrams 1 Block diagram A ...
Страница 130: ... 118 2 Power supply circuit diagram A ...
Страница 131: ... 119 3 Power supply circuit diagram B ...
Страница 132: ... 120 4 Power supply circuit diagram C ...
Страница 133: ... 121 5 Servo motor circuit diagram ...
Страница 135: ... 123 7 MAIN PANEL board circuit diagram ...
Страница 139: ......