KIROVETS K-744R1, K-744R2, K-744R3, K-744R4 tractors
95
Before operation of the tractor it is necessary to bring the linkage to the operating position
(Fig. 25, 26, 27) and reinstall the light signal equipment removed earlier.
Fig. 25 Installation of the linkage center
rod pivot
1
– pivot; 2 – tightening screw;
3
– center rod pipe
Fig. 26 Installation of hydraulic hitch
Hydraulic hitch platforms shall be installed below the bottom rod platforms.
Upon completion of preparatory works, perform maintenance when preparing the tractor for
operating running-in.
5.1.1 Adjustment of lower rods
Lower linkage rods (Fig.27) shall be adjusted as follows:
Screw
Retainer
Screw
Brace rod
pin
Platform for hy-
draulic hitch
pin