5
139262 Rev_H
9 / 11 / 2012
1.0 Installation
If this solid fuel room heater is not properly installed, a
house fire may result. For your safety, follow the installation
directions. Contact the local building or fire officials about
restrictions and installation inspection requirements in your area.
Your local officials have final authority in determining if a
proposed installation is acceptable. Any requirement by the
local authority having jurisdiction that is not specifically
addressed in this manual, defaults to NFPA 211, and local codes
in the U.S. or in Canada, CAN/CSA-B365-M and local codes.
1.1 Unpack the Stove
Inspect the stove for damage. Contact your dealer
immediately if any damage is found. Do not install the stove
if any damage is evident. Contact your dealer.
Contents:
• Top Load Door Tool
• Baffle Handle Assembly
• Bottom Heat Shield
• Flue Collar Heat Shield
• Stove Gloves
• #8 x 12 sheet metal screws, 4 -
for Flue Collar Heat Shield
• M6 hex nuts, 4 - for Bottom Heat Shield
NOTE: The integral Rear Shroud acts as a heat shield.
There is no accessory rear heat shield.
Figure 1. Actuation handles.
Front Door Handle
- ships fully assembled
Baffle Handle Assembly - insert
the shaft into the left side panel.
Top Exit
Flue Collar
Rear Exit
Flue Collar
Top Load Door Tool
6” Ø
(152 mm)