
23
139262 Rev_H
9 / 11 / 2012
Figure 27. Final Assembly.
Figure 28 . Floor Bracket Detail
Lag
Screw
7.3 Mobile Home Floor Bracket Kit
157321
Contents:
Floor Brackets , (2)
1. Determine the final location of the stove and use the
levelling bolts to make the stove level and plumb.
2. Mount the floor brackets over levelling bolts at rear and
front locations at opposite corners and secure each to
the floor using an appropriate length lag screw.
4. Orient the Front Manifold Panel as shown in figs. 25 and
26. Set it in place above the ash housing between the
front legs of the stove.
5. Attach the Main Manifold to the four studs on the stove
bottom and the two studs on the Front Manifold using
the hex head nuts provided.
6. Attach the Outside Air Bottom Heat Shield to the studs
on the bottom of the Main Manifold using four hex head
nuts provided.
7. Connect the outside air duct, (not provided) to the collar
using a duct clamp.