1
1. UNPACKING
1.1
After unpacking the GI-2000, the unit should be checked for any damage
that may have occurred during shipment. Any damage should be reported
to Josam Company immediately.
The following items should be included with the shipment:
QTY DESCRIPTION
1
GI-2000 G.R.D.Unit
1
GI-2000 Flow Control Fitting
1 GI-2000
Manual
1
15’ Controller Cable
1 GI-2000
Controller
1
Optional Reclaim Tank
GI-2000 UNIT
DIAGRAM “A”
208/220 Wiring Conduit Port