27
JO
NIX
up in
WARNING! check the tightness of the fastening system and the stability of the
JO
NIX
up in
device relation to the structure of the lift system, also considering
the kinetic energy to which it is subjected during the movement, starts and stops
of the lift.
Create an electrical panel that is independent of the elevator system. Protect the power
supply line upstream from
JO
NIX
up in
according to the regulations in force in the country of
installation. ALWAYS make sure that the mains voltage is in accordance with the information on
the nameplate. Connection cable not included in delivery.
Refer to chapter 8 "
JO
NIX
up in
MANAGEMENT AND OPERATION LOGIC" to set the fan speed
and to set the functions of the ionizing device. For lifts and lifting systems it is recommended
to set FUNCTION 4 to activate the ionizing device with external push button and to activate
the external alarm input I5 to turn off the device and turn on the red signal led in case of lift
blockage. Evaluate the fan speed setting according to the size of the lifting cab.
In case of doubt about the installation of
JO
NIX
up in
contact the Manufacturer or the Distributor.
Keep this Use and Maintenance Manual and the Declaration of Conformity at the disposal of
Notified Bodies and Authorized Bodies during periodic or extraordinary inspections of the lifting
equipment.
For the INSTALLATION of
JO
NIX
up in,
make sure to fix it firmly to the structure and not only to
the cladding. The fixing system is excluded from the supply, choose the fixing system suitable for
the structure and conformation of the lifting system, using stainless materials.
For the ELECTRIC POWER SUPPLY of the device, in addition to the wiring diagram and the
indications specified in paragraphs 6.4 "ELECTRICAL CONNECTIONS" and 6.5 " ELECTRIC
POWER SUPPLY " , consider that:
It is forbidden to modify the electrical control panel of the lift system (lift). It is
forbidden to modify the general electrical panel of the lift system (lift).
Verify the absence of alarms and the stability of the
JO
NIX
up in
device
at every
ordinary or extraordinary maintenance intervention on the lifting system.
Содержание 70JONIXUPIN
Страница 52: ...52 ANNEXES JONIX up in ELECTRIC PLANT...
Страница 53: ...53...
Страница 54: ...54...
Страница 55: ...55...
Страница 56: ...56...
Страница 57: ...57...
Страница 58: ...58...
Страница 59: ...59 NOTES...