18
JO
NIX
up in
Fig. 4B
Fig. 4A
Position of the operator for switching on, switching off and maintenance operations.
in front of the device
if placed on the wall
under the device
if placed on the ceiling
During operation of the unit, the presence of the operator in the vicinity of the device is not
required. For start-up, shutdown and maintenance, the operator's position must access the
external cover as shown in the figure.
6.3.1 Position of the operator
Содержание 70JONIXUPIN
Страница 52: ...52 ANNEXES JONIX up in ELECTRIC PLANT...
Страница 53: ...53...
Страница 54: ...54...
Страница 55: ...55...
Страница 56: ...56...
Страница 57: ...57...
Страница 58: ...58...
Страница 59: ...59 NOTES...