background image

t o   e n s u r e   p a c k a g e   c o u l d   b e   p l a c e d  
horizontallyandstably.Supportive tool 
should be used when disassembling the 
carton to prevent the modulesfromfalling
 down.

4.1.5

         Each module should be lifted by 2 man. 
Do not lift module by grasping the module
terminal box or lead wires. Use both hands 
to carr y module, do not stack modules 
during lifting.

4.1.6

         The unpacked modules must completely 
be assembled and prohibited from being 
stacked at the project site.

5.0

Installation

         Double glass modules produced by 
Jolywood could work for more than 30 years 
under proper conditions. Modules with an 
expired life should be reasonably disposed 
in accordance with local laws and regulations. 
Besides requirement of IEC certification, 

4.2.4

         Modules removed out of package are 
prohibited from leaning against a without 
reliable support or an unfixed object

4.2.3

         When removing modules from package, 
two man stand must stand on each side of 
the box while lifting the module, one hand 
grasping the corner of the module, the other 
hand grasping the short side of the module. 
When unpacking on a horizontal floor, remove 
modules from one side to the other side of 
package, and then carry them. If unpacking 
on a non-horizontal floor, use a supportive 
tool to ensure package placed verticality.

4.2.2

         When unpacking, cut all vertical packing 
belts with a blade or scissors, first cut the 
long side packing belt, then cut the short 
side packing belt; remove the upper cover 
of the carton and take out two or three upper 
lifting brackets.

4.2    Unpacking steps

4.2.1

         Before unpacking, please check the 
product name and serial number on an A4 

paper onthesurface of the package, unp-
acking method should not be randomly 
changed.

4.1.4

        Module information could be queried from 
outer package, please read it carefully before
unpacking.

4.1.3

         W e a r   p r o t e c t i v e   g l o v e s   d u r i n g  
unpacking to avoid injury and fingerprints 
on the glass surface.

7

Jolywood (Taizhou) Solar Technology Co.,Ltd.

Kaiyang Rd., Jiangyan Economic Development zone, Taizhou City, Jiangsu Province, P. R. China

www.jolywood.cn

 [email protected]

 +86-523-8061 2361

Installation Manual

 - Jolywood N-type Mono-crystalline Double Glass Module

Содержание JW-HD108N

Страница 1: ...INSTALLATION MANUAL Jolywood N type Mono crystalline Double Glass Module M10 Double glass module HD108N P All rights reserved Jolywood Taizhou Solar Technology Co Ltd...

Страница 2: ...Installation Safety Mechanical installation and precautions Framed Bifacial Double Glass Modules installation with clamps Grounding Electrical installation Wiring Fuse Maintenance for PV Modules Modu...

Страница 3: ...must be installed and maintained by quali ed person with professional knowledge Before installing wiring operating or maintaining modules you should read and understand all safety rules Modules will g...

Страница 4: ...odules from be damaged please avoid scratching cutting the cables and connectors or exposed under the sun for a long time Do not drop module or drop other things onto the module surface Do not place a...

Страница 5: ...le and ensure that the glass surface is facing down on a soft surface preventing water from entering inside of the module preventing connectors from be damaged Unpacking must be operated by two or mor...

Страница 6: ...aged with original package could be transported by land sea or air During transportation xing the package to the transport platform to ensure it would not be tumbled Taking land transportation as an e...

Страница 7: ...ng the corner of the module the other hand grasping the short side of the module When unpacking on a horizontal oor remove modules from one side to the other side of package and then carry them If unp...

Страница 8: ...ic shock may be caused Modules should be installed immediately after unpacked 5 1 4 Do not wear metal rings wristwatches earrings nose rings lip rings or other metal materials when installing or repai...

Страница 9: ...s y ste m d e s i g n e r b a s e d o n a c t u a l c o n d i t i o n s a n d en v i r o n m e n t a l M o r e o v e r i t d o e s n o t withstand the excessive force generated by the thermal expansi...

Страница 10: ...d front 1200pa back 1200pa Mounted with 4 clamps along the short frame A 250mm 30mm C shaped steel parallel to the long frame Clamp height 30mm width 40 50mm Maximum load front 4800pa back 1200pa Moun...

Страница 11: ...M8 A2 70 a stainless steel SUS304 at washer with an outer diameter of 20 2 mm and a thickness of 1 1 1 2 mm the corresponding stainless steel spring washer thickness is 2 0 0 2mm Bolt 11 Jolywood Tai...

Страница 12: ...p e r ca b l e w i t h a c ro s s sectional area of 4mm2 system voltage 1500V DC insulation layer maximum work temperature up to 90 C also UV resistant All cables used to connect the DC system m u s...

Страница 13: ...oads such as inverters batteries etc ensure that the polarity of the cables is properly connected Figure 1 and Figure 2 If modules are not connected properly the bypass diode may be damaged Modules co...

Страница 14: ...ypass diodes to minimize module heating and current loss 6 1 2 Check if the installed hardware is securely in place 6 1 3 Check if all array fuses in each of the non grounded poles are working properl...

Страница 15: ...essure on the surface of module glass shall not exceed 700 kPa 14619 80 lb ft2 and the module is not allowed to withstand additional external force such as oil on the surface of modules use a non fric...

Страница 16: ...t http www jolywood cn Our technical service representatives will contact you within 5 working days The required username and password will be sent via the Customer Service link Please download the sp...

Отзывы: