background image

3.1.6  Stack no more than 2 layers

3.2  Unloading Instructions

3.2.1

3.4 Storge

3.4.1

3.3  Secondary Transportation 

          and Precautions

3.3.1 

3.2.2

         When modules is temporarily stored in 
a project site, modules should be placed 
in a dry and ventilated place. Do not stack 
modules at a project site. Cover modules 
with a tarpaulin, the tarpaulin should be 
fixed by a curtain or mesh belt to protect 
modules from moisture and rain.

3.4.2

4.1.2

         The ground needs to be flat enough 

2

6

Jolywood (Taizhou) Solar Technology Co.,Ltd.

Kaiyang Rd., Jiangyan Economic Development zone, Taizhou City, Jiangsu Province, P. R. China

www.jolywood.cn

 [email protected]

 +86-523-8061 2361

         Warehouse requirement: Humidity <70%; 
Temperature: -20°C ~+50°C. Modules should 
be stacked less than 2 layers.

         It is forbidden to let modules be exposed to 
the rain or get wet. If it is necessary to store 
modules outdoors for a certain period of time, 
modules should always be covered.

        If the module would be transported for a 
too long distance or stored for a long period, 
it is forbidden to remove the original package. 

Modules packaged with original package could 
be transported by land, sea or air. During 
transportation, fixing the package to the 
transport platform to ensure it would not be 
tumbled. Taking land transportation as an 
example. When transported with truck, stacking 
up should be less than two layers, it is forbidden 
to cut thepackaging belts of packages.

        When unloading the modules from the 
transport vehicle, use a reasonable lifting fixture 
to allow up to two brackets per sling. Before lifting, 
make sure that the trays and cartons damaged, 
skewed, and that the hoisting ropes are durable. 
When the hoisting is on the ground, the two men 
put the carton gently on the project in a relatively 
flat position. Using a forklift to remove the 
components from the truck, and the unloaded 
modules placed on a level surface.

Installation Manual

 - Jolywood N-type Mono-crystalline Double Glass Module

4.0  Unpacking instruction

4.1  Unpacking safety instruction

4.1.1 

         When modules unpacked outdoors, it is 
forbidden to work under rain, as carton would 
becomesoft and be broken. Modules inside of 
it would come out, damage or bruises may be 
caused to module. During windy days, special 
attention should be paid for safety, it is reco-
mmended not to transport modules, and the 
unpacked modules should be properly fixed.

Содержание JW-HD108N

Страница 1: ...INSTALLATION MANUAL Jolywood N type Mono crystalline Double Glass Module M10 Double glass module HD108N P All rights reserved Jolywood Taizhou Solar Technology Co Ltd...

Страница 2: ...Installation Safety Mechanical installation and precautions Framed Bifacial Double Glass Modules installation with clamps Grounding Electrical installation Wiring Fuse Maintenance for PV Modules Modu...

Страница 3: ...must be installed and maintained by quali ed person with professional knowledge Before installing wiring operating or maintaining modules you should read and understand all safety rules Modules will g...

Страница 4: ...odules from be damaged please avoid scratching cutting the cables and connectors or exposed under the sun for a long time Do not drop module or drop other things onto the module surface Do not place a...

Страница 5: ...le and ensure that the glass surface is facing down on a soft surface preventing water from entering inside of the module preventing connectors from be damaged Unpacking must be operated by two or mor...

Страница 6: ...aged with original package could be transported by land sea or air During transportation xing the package to the transport platform to ensure it would not be tumbled Taking land transportation as an e...

Страница 7: ...ng the corner of the module the other hand grasping the short side of the module When unpacking on a horizontal oor remove modules from one side to the other side of package and then carry them If unp...

Страница 8: ...ic shock may be caused Modules should be installed immediately after unpacked 5 1 4 Do not wear metal rings wristwatches earrings nose rings lip rings or other metal materials when installing or repai...

Страница 9: ...s y ste m d e s i g n e r b a s e d o n a c t u a l c o n d i t i o n s a n d en v i r o n m e n t a l M o r e o v e r i t d o e s n o t withstand the excessive force generated by the thermal expansi...

Страница 10: ...d front 1200pa back 1200pa Mounted with 4 clamps along the short frame A 250mm 30mm C shaped steel parallel to the long frame Clamp height 30mm width 40 50mm Maximum load front 4800pa back 1200pa Moun...

Страница 11: ...M8 A2 70 a stainless steel SUS304 at washer with an outer diameter of 20 2 mm and a thickness of 1 1 1 2 mm the corresponding stainless steel spring washer thickness is 2 0 0 2mm Bolt 11 Jolywood Tai...

Страница 12: ...p e r ca b l e w i t h a c ro s s sectional area of 4mm2 system voltage 1500V DC insulation layer maximum work temperature up to 90 C also UV resistant All cables used to connect the DC system m u s...

Страница 13: ...oads such as inverters batteries etc ensure that the polarity of the cables is properly connected Figure 1 and Figure 2 If modules are not connected properly the bypass diode may be damaged Modules co...

Страница 14: ...ypass diodes to minimize module heating and current loss 6 1 2 Check if the installed hardware is securely in place 6 1 3 Check if all array fuses in each of the non grounded poles are working properl...

Страница 15: ...essure on the surface of module glass shall not exceed 700 kPa 14619 80 lb ft2 and the module is not allowed to withstand additional external force such as oil on the surface of modules use a non fric...

Страница 16: ...t http www jolywood cn Our technical service representatives will contact you within 5 working days The required username and password will be sent via the Customer Service link Please download the sp...

Отзывы: