3.1.6 Stack no more than 2 layers
3.2 Unloading Instructions
3.2.1
3.4 Storge
3.4.1
3.3 Secondary Transportation
and Precautions
3.3.1
3.2.2
When modules is temporarily stored in
a project site, modules should be placed
in a dry and ventilated place. Do not stack
modules at a project site. Cover modules
with a tarpaulin, the tarpaulin should be
fixed by a curtain or mesh belt to protect
modules from moisture and rain.
3.4.2
4.1.2
The ground needs to be flat enough
2
6
Jolywood (Taizhou) Solar Technology Co.,Ltd.
Kaiyang Rd., Jiangyan Economic Development zone, Taizhou City, Jiangsu Province, P. R. China
www.jolywood.cn
+86-523-8061 2361
Warehouse requirement: Humidity <70%;
Temperature: -20°C ~+50°C. Modules should
be stacked less than 2 layers.
It is forbidden to let modules be exposed to
the rain or get wet. If it is necessary to store
modules outdoors for a certain period of time,
modules should always be covered.
If the module would be transported for a
too long distance or stored for a long period,
it is forbidden to remove the original package.
Modules packaged with original package could
be transported by land, sea or air. During
transportation, fixing the package to the
transport platform to ensure it would not be
tumbled. Taking land transportation as an
example. When transported with truck, stacking
up should be less than two layers, it is forbidden
to cut thepackaging belts of packages.
When unloading the modules from the
transport vehicle, use a reasonable lifting fixture
to allow up to two brackets per sling. Before lifting,
make sure that the trays and cartons damaged,
skewed, and that the hoisting ropes are durable.
When the hoisting is on the ground, the two men
put the carton gently on the project in a relatively
flat position. Using a forklift to remove the
components from the truck, and the unloaded
modules placed on a level surface.
Installation Manual
- Jolywood N-type Mono-crystalline Double Glass Module
4.0 Unpacking instruction
4.1 Unpacking safety instruction
4.1.1
When modules unpacked outdoors, it is
forbidden to work under rain, as carton would
becomesoft and be broken. Modules inside of
it would come out, damage or bruises may be
caused to module. During windy days, special
attention should be paid for safety, it is reco-
mmended not to transport modules, and the
unpacked modules should be properly fixed.