background image

6

Air ducts

A  network  of  closed  return  ducts  should 
be used. This does not exclude the use of 
economisers or outdoor air intakes.
The impulse and return air connections of 
the unit should be carried out with flexible 
joints, so as to keep noise level to a mini-
mum.
The  impulse  and  return  air  duct  networks 
should  be  designed  in  accordance  with 
the air flow needs of the installation. These 
should  not  be  dimensioned  to  equal  the 
measurements  of  the  duct  connections  of 
the unit.

Duct covers

These units are shipped with the side and 
bottom duct openings covered.

For  applications  with  downward  ducts 
(bottom), Fig. 8

.  Return ducts:
 

-  Access  the  return  area  through  ac-

cess door (5).

 

-  Loosen the 4 screws (8) that fasten 

the  bottom  return  cover  (3)  to  the 
base of the unit.

 

-  Slide the cover out of the unit, leaving 

the  opening  clear  for  duct  connec-
tion.

 

-  Discard cover (3).

2.  Impulse ducts:
 

Attention:

 In the case of units with the 

hot water coil option, or D4IG units with 
gas heating, the impulse area cannot be 
accessed to remove the bottom impulse 
cover.

 

Therefore,  when  a  unit  with  a  bottom 
impulse duct is ordered, it is delivered 
factory-prepared, without the base cover, 
ready for connecting the impulse duct.

 

For  all  other  units,  apply  the  following 
instructions:

 

-  Access the impulse area through ac-

cess doors (6).

 

-  Remove bottom cover (7) by loosen-

ing the screws that fasten it to the side 
bottom of the unit.

 

-  Loosen the 2 screws (8) that fasten 

the bottom impulse cover (4) to the 
base of the unit.

 

-  Slide the cover out of the unit, leaving 

the  opening  clear  for  duct  connec-
tion.

 

-  Discard cover (4).

 

-  Very  important! The  interior  cover 

(7)  must  be  replaced  in  its  original 
position, without forgetting any of the 
screws.

3.  The  access  doors  have  ¼-turn  lock-

ing devices that require an 8 mm. hex 
wrench.

 

Once  this  operation  is  finished,  these 
should adjust correctly, fastening each 
one with the corresponding locking de-
vices.

For applications with side ducts, Fig. 9

.  Return duct:
 

-  Remove and discard cover (0).

GB

Model

D4IG

Heating

capacity (kW)

* Gas con-

sumption 

(m

3

/h) al 00% 

capacity

Total 

(L.H.C.)

Nett

360/480

30.7

7

2.8

 

-  Connect the duct to the flange along 

the entire parameter of the side open-
ing of the unit.

2.  Impulse duct:
 

-  Remove and discard cover ().

 

-  Connect the duct to the flange along 

the entire parameter of the side open-
ing of the unit.

3.  In both cases, make sure of air tightness 

between the duct and the unit panel.

4.  Very important! Cover (9) corresponds to 

the opening for outdoor air intake when 
the unit is equipped with the correspond-
ing optional accessory (economiser or 
outdoor air manual damper).

 

Should  the  unit  not  be  equipped  with 
either of these accessories, it is supplied 
with  the  cover  fitted,  and  none  of  the 
screws that fasten it to the panel should 
be removed under any circumstances.

Complements to be mount-
ed at job site 

Indoor  unit  condensed  water 
drain

Tubing  installation  should  adjust  to  local 
regulations.  Use  sealing  paste  on  male 
threads. Install a condensed water drain line 
from the female connection on the unit, to 
an open drain.

Note:

 The condensed water drain line 

must

 

have  a  siphon  for  correct  drainage.  See 
Fig. 0.
The drain line should have a slope of at least 
2 cms. per each meter in length.

Gas  installation 

(models 

D4IG)
Gas pipes

Correct  sizing  of  the  gas  pipes  depends 
upon the flow needed, specific density of the 
gas and the length of the layout. All local gas 
company regulations and recommendations 
should be followed to determine the piping 
diameter. 
Gas  heating  capacity  can  vary  from  one 
location to another. Heating capacity should 
be  checked  with  the  local  gas  company 
(supplier).

Gas connection

Fig.    shows  the  position  of  the  supply 
piping.
Indications  on  the  gas  line  supplying  the 
unit:
.  A supplement for condensed water and 

grounding should be installed.

2.  A  manual  ball  valve  should  be  in-

stalled.

3.  Use wrought iron or steel pipes for all gas 

lines.  Sealing  putty  should  be  applied, 
moderately, on male threads only.

Warning

Natural gas can contain a small 
amount  of  propane.  Due  to  the 
fact that propane is an excellent 

solvent,  it  will  quickly  dissolve  the  carbon 
carbonate  or  most  commercial  type  com-
pounds. Therefore, a special sealing putty 
should be applied when using wrought iron 
or steel pipes.
A putty that complies with Standard BS6956 
Part 5, or equivalent, can be used.

4.  All dirt and scales should be removed 

from  the  pipes,  by  striking  the  outer 
surface of the pipe with a hammer and 
blowing through the pipes to eliminate 
the deposits or particles it could contain. 
Prior to initial start-up, make sure all ex-
ternal gas lines leading to the unit have 
been air-purged.

5.  Gas  supply  should  be  carried  out  by 

means  of  an  independent  line,  and 
should be installed in compliance with 
all  state,  local  or  municipal  standards. 
Once  the  gas  connection  is  finished, 
open  the  main  valve  to  normal  gas 
supply pressure. Check for leaks at the 
joints using a soapy solution or with any 
other appropriate method. 

NEVER USE 

A FLAME

.

6.  To  avoid  possible  damage  of  the  gas 

valves, the unit burner assembly should 
be  disconnected  from  the  gas  pipe 
system during the pressure test of said 
system.

Gas heating application infor-
mation

* Based on natural gas 2ND-H, G20, at 20 mbar 

and 5° C

L.H.C. = Lower heating capacity.

Start-up

Before starting the equipment up, the neces-
sary adjustments should be carried out so as 
to adapt air flows to the installation.
Check air tightness of connections carried 
out at the job site with regard to rain water 
leaking in.
Check the information available in the techni-
cal manuals of these units.

Start-up models D4IG

Gas  heating  start-up,  models 
D4IG

List of prior checks:
.  Check the type of gas to be used. Make 

sure  it  is  the  same  as  shown  on  the 
identification plate located on the burner 
assembly access door.

Содержание YORK B4IH 360

Страница 1: ...sadas por aire y bombas de calor hasta 600 kW Johnson Controls Manufacturing España S L is participating in the EUROVENT Certification Programme Products are as listed in the EUROVENT Directory of Certified Products in the program AC1 AC2 AC3 LCP and FC The LCP program covers air condensed water chillers and heat pumps of up to 600 kW Johnson Controls Manufacturing España S L participe au Programm...

Страница 2: ... ...

Страница 3: ... Fig 1 Fig 2 Fig 3 Fig 5 Fig 6 Fig 4 Fig 7 ...

Страница 4: ... Fig 8 Fig 9 Fig 10 Fig 11 ...

Страница 5: ...on inclus Apêndice para condensados não fornecido 1 Barra separadora Spacer bar Barre de séparation Barra separadora 2 Grillete Clevis Manille Grilheta 3 Tapa retorno inferior Bottom return cover Couvercle reprise inférieure Tampa de retorno inferior 4 Tapa impulsión inferior Bottom impulse cover Couvercle soufflage inférieur Tampa de impulsão inferior 5 Puerta acceso retorno Return access door Po...

Страница 6: ...a cargo del distribuidor y o del cliente Transporte y manejo Tener cuidado al mover el equipo No qui tar ninguna parte del embalaje hasta que el equipo esté situado cerca del lugar de instalación Atención No utilizar carretilla elevadora Suspender el equipo mediante las 4 orejetas previstas en la base Utilizar grilletes y eslingas de cadena o cable En la parte superior deben usarse separa dores cu...

Страница 7: ...sados bate ría interior La instalación de tuberías debe ajustarse a la reglamentación local Utilizar pasta selladora en las roscas macho Instalar una línea de drenaje de condensados desde la conexión hembra que hay en el equipo hasta un desagüe abierto Nota La línea de drenaje de los conden sados debe tener un sifón para facilitar un correcto vaciado Ver Fig 10 La línea de drenaje debe tener una i...

Страница 8: ...e comprobaciones pos teriores a la puesta en mar cha Después de haber activado todo el circuito de control y de que la calefacción de gas esté en funcionamiento realizar las com probaciones siguientes 1 Comprobar que no haya fugas de gas en las tuberías del equipo ni en las de suministro 2 Verificar la presión del suministro de gas con todos los aparatos de gas que hay en el edificio funcionando a...

Страница 9: ...de presión en Pc 3 Con solo la etapa nº 1 de calor en fun cionamiento Ajustar el regulador 1ª etapa V1 en la válvula GV1 lectura de presión en Pc 4 Una vez realizados los ajustes apretar el tornillo de fijación T de los volantes de regulación 5 Poner el equipo en funcionamiento con las 4 etapas de calor durante un mínimo de 15 minutos y comprobar el contenido de CO y CO2 según indicado en el punto...

Страница 10: ...orma tiva nacional local o municipal vigente Las tolerancias de voltaje que deben mantener se en los terminales del compresor durante el arranque y el funcionamiento están indi cadas en la Placa de Características La línea eléctrica debe estar bien dimen sionada para soportar la carga Utilizar sólo conductores de cobre Cada uno de los equipos debe ir conectado a un circuito independiente con inter...

Страница 11: ...11 Dimensiones espacios libres y accesos modelos D4IC y B4IH E ...

Страница 12: ...12 E Resto de dimensiones y detalles segun D4IC B4IH ...

Страница 13: ...opcional HPD Pa 480 465 Potencia motor kW 9 2 Standard 11 Opcional HPD 11 Standard 15 Opcional HPD Transmisión Correa polea polea diámetro ajustable Batería del evaporador Distancia entre aletas mm 1 81 1 81 Superfície m2 2 9 3 7 Dimensiones Altura mm 1 815 1 815 Longitud 5 mm 4 580 4 580 Anchura mm 2 200 2 200 Peso unidad basica sin accesorios 5 D4IC kg 2 010 2 295 D4IG kg 2 124 2 409 Condiciones...

Страница 14: ...50 60 Intensidad nominal arranque A 85 167 112 272 Nº de circuitos 3 3 Límites de utilización TAE máximo TS verano 3 C 46 46 TAE mínimo TS verano C 7 7 TAE máximo TS invierno C 20 20 TAE mínimo TS invierno C 20 20 Aire Ret TH verano min max C 14 23 14 23 Aire Ret TS verano min max C 20 32 20 32 Aire Ret TS invierno min max C 10 25 10 25 Refrigerante por circuito segun modelo R 407C kg 13 7 13 7 13...

Страница 15: ... local regulations these should be installed at the expense of the distributor and or the client Transportation and handling Be careful when moving this equipment Do not remove any part of the packing until the unit is located close to where it is to be installed Attention Do not use fork lift trucks Hang the unit by means of the suspension holes located at the base Use clevises and chain or cable...

Страница 16: ... Complementstobemount ed at job site Indoor unit condensed water drain Tubing installation should adjust to local regulations Use sealing paste on male threads Install a condensed water drain line from the female connection on the unit to an open drain Note The condensed water drain line must have a siphon for correct drainage See Fig 10 The drain line should have a slope of at least 2 cms per eac...

Страница 17: ...ssembly will ignite It could take a few minutes depending upon the mode established on the thermostat Check list after start up After having activated the entire control circuit and the gas heating is in operation check the following 1 Make sure there are no gas leaks in the unit and supply pipes 2 Check gas supply pressure with all gas units in the building operating at full ca pacity In no case ...

Страница 18: ...st the main regulator pressure reading in Pa Adjust the 2nd stage regulator V2 pressure reading in Pc Pay close attention to the different values in both valves GV1 and GV2 2 With heat stages 1 2 and 3 in opera tion Adjust the 1st stage regulator V1 on valve GV2 pressure reading in Pc 3 With heat stage 1 only in operation Adjust the 1st stage regulator V1 on valve GV1 pressure reading in Pc 4 Once...

Страница 19: ...terproof type connec tors should be used so as to avoid water or dampness getting into the unit during normal operation These waterproof conditions are also applicable when a switch is installed at job site See Typical job site wiring concerning the unit wiring diagram as well as information on the control circuit and power supply wiring Thermostat The ambient thermostat should be located on an in...

Страница 20: ...20 GB Dimensions clearances and accesses models D4IC and B4IH ...

Страница 21: ...21 GB Dimensions clearances and accesses models D4IG Remaining dimensions and details as per D4IC B4IH ...

Страница 22: ...ard 11 Optional HPD 11 Standard 15 Optional HPD Transmission Belt pulley adjustable diameter pulley Evaporating unit coil Distance between fins mm 1 81 1 81 Surface m2 2 9 3 7 Dimensions Height mm 1 815 1 815 Length 5 mm 4 580 4 580 Width mm 2 200 2 200 Weight basic unit without accessories 5 D4IC kg 2 010 2 295 D4IG kg 2 124 2 409 Model Power supply Compressor Outdoor fan motor Indoor fan motor T...

Страница 23: ... 4 Blade Ø mm 630 630 Power kW 1 5 1 5 Condensing unit coil Distance between fins mm 1 81 1 81 2 11 Surface m2 7 8 5 Evaporating unit fan 4 Nominal air flow m3 h 21 000 25 000 Available pressure at nominal flow Standard Pa 300 275 With HPD accessory Pa 480 465 Motor power kW 9 2 Standard 11 Optionall HPD 11 Standard 15 Optional HPD Transmission Belt pulley adjustable diameter pulley Evaporating un...

Страница 24: ...i buteur et ou du client Transport et manutention Il faut faire attention quand il s agit de trans porter l appareil N enlever aucune partie de l emballage jusqu à ce que l appareil se trouve près du lieu d installation Attention Ne pas utiliser de chariot élé vateur Lever l appareil à l aide des 4 boucles pré vues à cet effet à la base Utiliser des manilles et des élingues de chaîne ou de câble D...

Страница 25: ...en aucun cas il ne faut retirer ou dévisser les vis qui le fixent au panneau Compléments à monter sur le chantier Drainage de condensats de la batterie intérieure L installation de tuyaux doit être réalisée en respectant la réglementation locale Utiliser une pâte collante dans les filets mâles Installer une ligne de drainage de condensats depuis le raccordement femelle présent dans l appareil jusq...

Страница 26: ...l 4 Ouvrir la vanne de passage de la distri bution de gaz à l appareil 5 Placer le thermostat d ambiance à sa température maximale 6 Le groupe brûleur s allumera il peut tarder quelques minutes en fonction du mode établi dans le thermostat Liste des vérifications posté rieures à la mise en marche Après avoir activé tout le circuit de contrôle et quand le chauffage à gaz est en mar che il convient ...

Страница 27: ...n Pa régler le régulateur 2ème étage V2 lecture de pression en Pc Attention aux valeurs différentes dans les deux vannes GV1 et GV2 2 Avec les étages de chauffage n 1 2 et 3 en fonctionnement Régler le régulateur 1er étage V1 dans la vanne VG2 lecture de pres sion en Pc 3 Avec seulement l étage de chauffage n 1 en fonctionnement Régler le régulateur 1er étage V1 dans la vanne GV1 lecture de pres s...

Страница 28: ...ppareil il faut utiliser des connecteurs de type imperméable afin d éviter l entrée d eau ou d humidité dans l appareil pendant son fonctionnement normal Ces conditions d imperméabilité sont également indispensables quand un interrupteur est installé sur le chantier Voir Câblage sur un chantier typique sur le schéma électrique de l appareil et pour les informations sur le circuit de contrôle et le...

Страница 29: ...29 F Dimensions dégagements nécessaires et accès modèles D4IC et B4IH ...

Страница 30: ...30 F Dimensions dégagements nécessaires et accès modèles D4IC Autres dimensions et détails selon D4IC B4IH ...

Страница 31: ...églable Batterie de l unité d évaporation Distance entre ailettes mm 1 81 1 81 Surface m2 2 9 3 7 Dimensions Hauteur mm 1 815 1 815 Longueur 5 mm 4 580 4 580 Largeur mm 2 200 2 200 Poids unité de base sans accessoires 5 D4IC kg 2 010 2 295 D4IG kg 2 124 2 409 Modèle Alimentation Compresseur Moteur ventilateur extérieur Moteur ventilateur intérieur Nominale totale Intensité nominale to tale Apparei...

Страница 32: ...n 4 Débit nominal d air m3 h 21 000 25 000 Pression maximale disponible en débit nominal Standard Pa 300 275 Avec HPD en option Pa 480 465 Puissance du moteur kW 9 2 Standard 11 HPD en option 11 Standard 15 HPD en option Transmission Courroie poulie poulie diamètre réglable Batterie de l unité d évaporation Distance entre ailettes mm 1 81 1 81 Surface m2 2 9 3 7 Dimensions Hauteur mm 1 815 1 815 L...

Страница 33: ...idado ao mover o equipamen to Não retirar qualquer parte da embalagem até o equipamento estar colocado perto do lugar de instalação Atenção Não utilizar carretilha elevadora Pendurar o equipamento por meio dos 4 orifícios previstos para este fim que se en contram na base Utilizar grilhetas e eslingas de corrente ou de cabo Na parte superior devem se utilizar sepa radores cujo comprimento ultrapass...

Страница 34: ...a tampa montada a qual em caso nenhum deve ser desmon tada nem afrouxados os parafusos que a fixam no painel Complementos a montar na obra Drenagem de condensados da bateria interior A instalação de tubagens tem de cumprir a regulamentação local Utilizar massa vedante nas roscas macho Há que instalar uma linha de drenagem de condensados a partir da ligação fêmea que se encontra no equipamento até ...

Страница 35: ...éctrico ao equi pamento 4 Abrir a válvula de passagem do forneci mento de gás ao equipamento 5 Ajustar o termóstato ambiente para a sua temperatura máxima em calor 6 O grupo queimador acender se á Pode demorar uns minutos em função do modo estabelecido no termóstato Lista de verificações poste riores à entrada em funciona mento Depois de ter activado o circuito de controlo todo e de a calefacção d...

Страница 36: ...regulador principal leitura da pressão em Pa ajustar o regulador da 2ª etapa V2 leitura da pressão em Pc Atenção aos valores distintos em ambas as válvulas GV1 e GV2 2 Tendo as etapas núm 1 2 e 3 de calor a funcionar ajustar o regulador da 1ª etapa V1 na válvula GV2 leitura da pressão em Pc 3 Tendo apenas a etapa núm 1 de calor a funcionar ajustar o regulador da 1ª etapa V1 na válvula GV1 leitura ...

Страница 37: ...s de ligação do tipo impermeável de forma a evitar a entrada de água ou de humidade no equipamento durante o funcionamento normal do mesmo As ditas condições de impermeabilidade também são de aplicação no caso de instalar um interruptor na obra Veja se a secção Instalação típica do conjunto de cabos na obra em relação ao esquema eléctrico do equipamento e infor mação do circuito de controlo e dos ...

Страница 38: ...38 P Dimensões espaços livres e acessos modelos D4IC e B4IH ...

Страница 39: ...39 P Dimensões espaços livres e acessos modelos D4IG Resto de dimensões e detalhes segundo D4IC B4IH ...

Страница 40: ...evaporador Distância entre aletas mm 1 81 1 81 Superfície m2 2 9 3 7 Dimensões Altura mm 1 815 1 815 Comprimento 5 mm 4 580 4 580 Largura mm 2 200 2 200 Peso unidade básica sem acessórios 5 D4IC kg 2 010 2 295 D4IG kg 2 124 2 409 Modelo Alimentação Compressor Motor do ventilador exterior Motor do ventilador interior Nominal total Intensidade nominal total equipamento Ampérios Intensidade máxima to...

Страница 41: ...nal de ar m3 h 21 000 25 000 Pressão máxima disponível com o caudal nominal Standard Pa 300 275 Com HPD opcional Pa 480 465 Potência do motor kW 9 2 standard 11 opcional HPD 11 standard 15 opcional HPD Transmissão Correia polia polia de diâmetro regulável Bateria do evaporador Distância entre aletas mm 1 81 1 81 Superficie m2 2 9 3 7 Dimensões Altura mm 1 815 1 815 Comprimento 5 mm 4 580 4 580 Lar...

Страница 42: ...www johnsoncontrols com ...

Отзывы: