22
Installation checklist
The qualified technician should complete
this checklist and leave it with the owner of
the cooker.
Please tick to confirm that the following
checks have been completed:
Date of installation:
Cooker model numer:
Cooker serial number:
The cooker is level
Ignition of the cooking zone tested
Auto programmer left in manual
mode
Customer briefed on how to use the
cooker
User manual and installation
instructions left with the owner
Name of qualified technician:
Corgi registration number (if applicable):
Company name:
Company address:
Telephone number:
Signed:
Date: