SECTION 3 - CHASSIS & TURNTABLE
3121160
– JLG Lift –
3-85
3.20 TILT ALARM SWITCH (PRIOR TO S/N
0300062045)
PERFORM TILT ALARM SWITCH LEVELING PROCEDURE A MINI-
MUM OF EVERY SIX MONTHS TO ENSURE PROPER OPERATION
AND ADJUSTMENT OF SWITCH.
Manual Adjustment.
1.
Park the machine on a flat, level surface. Ensure
machine is level and tires are filled to rated pressure.
NOTE:
Ensure switch mounting bracket is level and securely
attached.
2.
Level the base of the indicator by tightening the
three flange nuts through approximately one quarter
of its spring travel. DO NOT ADJUST THE “X” NUT
DURING THE REMAINDER OF THE PROCEDURE.
3.
With the electrical connections complete, using bub-
ble level on top of indicator, slowly tighten or loosen
the three flange nuts until indicator is level.
4.
Individually push down on one corner at a time;
there should be enough travel to cause the switch to
trip. If the switch does not trip in all three tests, the
flange nuts have been tightened too far. Loosen the
“X” nut and repeat steps (2) through (4) LIMIT
SWITCHES ADJUSTMENTS.
3.21 SPARK ARRESTER CLEANING
INSTRUCTIONS
1.
1.
Remove the cleanout plug in the bottom of spark
arrester (muffler).
2.
Without causing deformation (or any type of dam-
age to the spark arrester) repeatedly tap on the
arrester near the cleanout plug. This may be enough
to begin drainage of the spark trap.
3.
An industrial vacuum cleaner can do a complete job
at this point.
a.
Or, IN A SAFE AREA, start the engine. Then
alternate between low idle and high idle for two
to three minutes.
b.
Or, operate the engine as required by the appli-
cation for two to three minutes.
4.
Install the cleanout plug. (See Table 2-5. Preventive
Maintenance and Inspection Schedule.)
Table 3-9. Coupling Port Information Table
Port
No.
Outlets
Port Size
Description
Operating
Pressure
PSI (Bar)
Proof
Pressure
PSI (Bar)
1
2
-6
Brake
450 (31)
675 (46.5)
2
2
-6
2 Speed
4500 (310) 6750 (465)
3
1
-6
Steer
2500 (138)
3750
(258.5)
4
1
-6
Steer
2500 (172)
3750
(258.5)
5
3
2-16, 1-6
Drive Reverse
4500 (310) 6750 (465)
6
1
-16
Drive Forward
4500 (310) 6750 (465)
7
2
-12
Drain
250 (17)
375 (26)
Figure 3-50. Tilt Switch Adjustment.
Содержание 740A
Страница 1: ...Service and Maintenance Manual Models 740A 740AJ P N 3121160 January 8 2013 ...
Страница 2: ......
Страница 20: ...xviii JLG Lift 3121160 LIST OF TABLES TABLE NO TITLE PAGE NO This page left blank intentionally ...
Страница 35: ...SECTION 1 SPECIFICATIONS 3121160 JLG Lift 1 15 Figure 1 4 Torque Chart SAE Fasteners Sheet 1 of 3 ...
Страница 36: ...SECTION 1 SPECIFICATIONS 1 16 JLG Lift 3121160 Figure 1 5 Torque Chart SAE Fasteners Sheet 2 of 3 ...
Страница 37: ...SECTION 1 SPECIFICATIONS 3121160 JLG Lift 1 17 Figure 1 6 Torque Chart SAE Fasteners Sheet 3 of 3 ...
Страница 38: ...SECTION 1 SPECIFICATIONS 1 18 JLG Lift 3121160 Figure 1 7 Torque Chart METRIC Fasteners Sheet 1 of 3 ...
Страница 39: ...SECTION 1 SPECIFICATIONS 3121160 JLG Lift 1 19 Figure 1 8 Torque Chart METRIC Fasteners Sheet 2 of 3 ...
Страница 40: ...SECTION 1 SPECIFICATIONS 1 20 JLG Lift 3121160 Figure 1 9 Torque Chart METRIC Fasteners Sheet 3 of 3 ...
Страница 50: ...SECTION 2 GENERAL 2 10 JLG Lift 3121160 Figure 2 2 Engine Operating Temperature Specifications Ford 4150548 E ...
Страница 51: ...SECTION 2 GENERAL 3121160 JLG Lift 2 11 Figure 2 3 Engine Operating Temperature Specifications GM 4150548 E ...
Страница 52: ...SECTION 2 GENERAL 2 12 JLG Lift 3121160 NOTES ...
Страница 109: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 57 Figure 3 39 Swing Hub ...
Страница 111: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 59 Figure 3 40 Swing Brake Assembly Ausco Prior to S N 0300068040 ...
Страница 123: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 71 Figure 3 43 Swing Drive Hub Fairfield S N 0300068040 to Present ...
Страница 135: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 83 Figure 3 48 Rotary Coupling Port Location ...
Страница 138: ...SECTION 3 CHASSIS TURNTABLE 3 86 JLG Lift 3121160 A B D D B C Figure 3 51 Auxiliary Pump Sheet 1 of 2 ...
Страница 153: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 101 Figure 3 54 EFI Component Location ...
Страница 156: ...SECTION 3 CHASSIS TURNTABLE 3 104 JLG Lift 3121160 Figure 3 55 ECM EPM Identification ECM EPM ...
Страница 167: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 115 Figure 3 59 Deutz EMR 2 Troubleshooting Flow Chart ...
Страница 168: ...SECTION 3 CHASSIS TURNTABLE 3 116 JLG Lift 3121160 Figure 3 60 Deutz EMR 2 Vehicle Side Connection Diagram ...
Страница 169: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 117 Figure 3 61 Deutz EMR 2 Engine Side Connection Diagram Sheet 1 of 2 ...
Страница 170: ...SECTION 3 CHASSIS TURNTABLE 3 118 JLG Lift 3121160 Figure 3 62 Deutz EMR 2 Engine Side Connection Diagram Sheet 2 of 2 ...
Страница 171: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 119 Figure 3 63 EMR 2 Engine Plug Pin Identification ...
Страница 172: ...SECTION 3 CHASSIS TURNTABLE 3 120 JLG Lift 3121160 Figure 3 64 EMR 2 Vehicle Plug Pin Identification ...
Страница 173: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 121 Figure 3 65 EMR2 Fault Codes Sheet 1 of 5 ...
Страница 174: ...SECTION 3 CHASSIS TURNTABLE 3 122 JLG Lift 3121160 Figure 3 66 EMR2 Fault Codes Sheet 2 of 5 ...
Страница 175: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 123 Figure 3 67 EMR2 Fault Codes Sheet 3 of 5 ...
Страница 176: ...SECTION 3 CHASSIS TURNTABLE 3 124 JLG Lift 3121160 Figure 3 68 EMR2 Fault Codes Sheet 4 of 5 ...
Страница 177: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 125 Figure 3 69 EMR2 Fault Codes Sheet 5 of 5 ...
Страница 236: ...SECTION 4 BOOM PLATFORM 4 20 JLG Lift 3121160 Figure 4 7 Boom Valve and Limit Switches Location 0271989 A ...
Страница 237: ...SECTION 4 BOOM PLATFORM 3121160 JLG Lift 4 21 Figure 4 8 Transportation Switch Installation CE Only 0258384 A ...
Страница 238: ...SECTION 4 BOOM PLATFORM 4 22 JLG Lift 3121160 Figure 4 9 Tower Power Track Installation Sheet 1 of 2 ...
Страница 239: ...SECTION 4 BOOM PLATFORM 3121160 JLG Lift 4 23 Figure 4 10 Tower Power Track Installation Sheet 2 of 2 ...
Страница 244: ...SECTION 4 BOOM PLATFORM 4 28 JLG Lift 3121160 Figure 4 14 Rotator Assembly HELAC ...
Страница 276: ...SECTION 4 BOOM PLATFORM 4 60 JLG Lift 3121160 THIS SENSOR ON NON ADE MACHINES ONLY Figure 4 21 UMS Sensor Location ...
Страница 277: ...SECTION 4 BOOM PLATFORM 3121160 JLG Lift 4 61 ADE MACHINES NON ADE MACHINES Figure 4 22 UMS Module Location ...
Страница 286: ...SECTION 4 BOOM PLATFORM 4 70 JLG Lift 3121160 NOTES ...
Страница 307: ...SECTION 5 HYDRAULICS 3121160 JLG Lift 5 21 Figure 5 17 Variable Displacement Pump Rexroth ...
Страница 316: ...SECTION 5 HYDRAULICS 5 30 JLG Lift 3121160 NOTES ...
Страница 319: ...SECTION 6 JLG CONTROL SYSTEM 3121160 JLG Lift 6 3 Figure 6 2 ADE Block Diagram ...
Страница 325: ...SECTION 6 JLG CONTROL SYSTEM 3121160 JLG Lift 6 9 Figure 6 8 Analyzer Flow Chart Version 5 X Software Sheet 2 of 4 ...
Страница 328: ...SECTION 6 JLG CONTROL SYSTEM 6 12 JLG Lift 3121160 Figure 6 11 Control Module Location ...
Страница 374: ...SECTION 6 JLG CONTROL SYSTEM 6 58 JLG Lift 3121160 NOTES ...
Страница 381: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 3121160 JLG Lift 7 7 Figure 7 11 Connector Installation ...
Страница 400: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 26 JLG Lift 3121160 Figure 7 34 Hydraulic Schematic Sheet 1 of 6 ...
Страница 402: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 28 JLG Lift 3121160 Figure 7 36 Hydraulic Schematic Sheet 3 of 6 ...
Страница 404: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 30 JLG Lift 3121160 Figure 7 38 Hydraulic Schematic Sheet 5 of 6 ...
Страница 406: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 JLG Lift 3121160 NOTES ...
Страница 407: ......